G10 Installation Guide 7.13.2
76
User Documentation
Connect G10 to the
Monitored Network
M
ONITORED
L
INK
S
UPPORT
The final step in the G10 installation process is connecting the G10 to the monitored network
via 1G or 10G Ethernet connections on the IIC. Refer to the following sections for cabling
diagrams for connecting the G10 probe to the monitored network:
Monitored Link Cabling (IIC200)
Monitored Link Cabling (IIC100)
The number of monitored links a G10 probe supports depends on several factors as shown in
Table 5.1
..
Table 5.1 - Maximum Monitored Links per Probe
Interface Type
Link Type
Maximum Monitored Links
Span/Mirrored
(1 monitored link requires 1 port)
1G
8
10G
4
Mixed 1G + 10G
4 10G + 4 1G max
3 10G + 5 1G max
2 10G + 6 1G max
1 10G + 7 1G max
Optical Taps/Splitters
(1 monitored link requires 2 ports)
1G
4
10G
2
Mixed 1G + 10G
2 10G + 2 1G max