Contents
ECO 422
iii
List of Figures
Figure 1–1: Front of the ECO 422
1–1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 1–2: Rear of the ECO 422
1–1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 1–3: Front Rail Mount
1–3
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 1–4: Deep Rackmount
1–3
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 1–5: Shallow Rackmount
1–4
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 1–6: Assembly of Rackmounting Hardware
1–4
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 1–7: Installing the Instrument in the Rack Slides
1–5
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 1–8: Example of How the ECO 422 Can be Connected
1–7
. . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 1–9: Default Position of the User Configuration and Mode Switches
1–9
. . . . . . . . . . . . . . . .
Figure 1–10: Setup for the Functional Check
1–10
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 2–1: Front-Panel Controls
2–1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 2–2: Default Position of the User Configuration and Mode Switches
2–2
. . . . . . . . . . . . . . . .
Figure 2–3: Rear of the ECO 422
2–4
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 2–4: Remote Connector Pin-Out
2–5
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 2–5: Wiring Required to Conform with SMPTE Fault Reporting
2–6
. . . . . . . . . . . . . . . . . . . .
Figure 2–6: Setup for Adjusting R265 (the User Level for SX-7)
2–9
. . . . . . . . . . . . . . . . . . . . . . . . .
Figure 2–7: Flowchart for Adjusting R265
2–10
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 4–1: Block Diagram of the ECO 422
4–1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 4–2: Block Diagram of the Input Comparator
4–2
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 4–3: Block Diagram for the Control and Remote Circuit
4–4
. . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 4–4: Reference Voltage and Selector Switch Farm Block Diagram
4–6
. . . . . . . . . . . . . . . . . .
Figure 5–1: Setup to Check Black Burst Levels
5–8
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 5–2: Setup to Check the Component Serial Digital Video Levels
5–12
. . . . . . . . . . . . . . . . . . . .
Figure 5–3: Setup to Check the Serial Digital Video Composite Levels
5–14
. . . . . . . . . . . . . . . . . . . .
Figure 5–4: Setup to Check the Serial Audio Levels
5–17
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 7–1: Remove these Screws and Post before Attempting to Remove the Connector Board
7–8
Figure 7–2: Slide the Connector Board Out this Way
7–9
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 7–3: Remove the Heat Sinks this Way
7–10
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Summary of Contents for ECO 422
Page 4: ......
Page 6: ......
Page 14: ...General Safety Summary viii ECO 422 ...
Page 16: ...Service Safety Summary x ECO 422 ...
Page 17: ...Getting Started ...
Page 18: ......
Page 31: ...Operating Basics ...
Page 32: ......
Page 41: ...Operating Basics ECO 422 2 9 Figure 2 6 Setup for Adjusting R265 the User Level for SX 7 ...
Page 43: ...Specifications ...
Page 44: ......
Page 52: ......
Page 53: ...Theory of Operation ...
Page 54: ......
Page 62: ...Theory of Operation 4 8 ECO 422 ...
Page 63: ...Performance Verification ...
Page 64: ......
Page 84: ...Performance Verification 5 20 ECO 422 ...
Page 85: ...Adjustment Procedure ...
Page 86: ......
Page 88: ...Adjustment Procedure 6 2 ECO 422 ...
Page 89: ...Maintenance ...
Page 90: ......
Page 101: ...Options ...
Page 102: ......
Page 104: ...Options 8 2 ECO 422 ...
Page 105: ...Replaceable Electrical Parts ...
Page 106: ......
Page 140: ...Replaceable Electrical Parts 9 34 ECO 422 ...
Page 141: ...Diagrams Circuit Board Illustrations ...
Page 142: ......
Page 145: ......
Page 147: ... ECO 422 Changeover Unit FRONT PANEL 1 ...
Page 148: ...ECO 422 ...
Page 166: ...ECO 422 ...
Page 167: ...Replaceable Mechanical Parts ...
Page 168: ......
Page 174: ...Replaceable Mechanical Parts 11 6 ECO 422 ...
Page 175: ......
Page 176: ...ECO 422 A1 FIG 1 EXPLODED VIEW A2 A3 A4 ...
Page 177: ......