![teko Astra-8 User Manual Download Page 2](http://html1.mh-extra.com/html/teko/astra-8/astra-8_user-manual_1077162002.webp)
Plug
Jumper
position
“Alarm memory”
ON
“Alarm memory”
OFF
Mem
AC-channel
TEST
Tst
See sec. 9
6 INSTALLATION PLACE
1)
Recommended installation height is
2.4-3.6
m
and at a distance not more than
6m
from the
most distant spot of protected glass
.
2)
Detector should be installed on the ceiling
(or any other horizontal surface)
strictly
horizontally
.
3)
The detector cannot be used in premises
with high level of acoustic interference.
4)
Alarm loop and power supply wires should
be located far from power cables.
To eliminate false alarm hazards
1)
It is recommended to close all doors, air-
vents, switch off possible sourses of intense air
flows (fans, air-conditioners)
and
acoustic inter-
ferences
(
loudspeakers
, etc.)
in the room during
protection period
.
2)
The detector's location should provide di-
rect visibility of all secured glass parts; masking
the detector with decorative curtains is not al-
lowed, as sensitivity may be lost
.
Not recommended installation places
7 INSTALLATION PROCEDURE
1)
Remove cover
2)
Remove PCB
3)
Install on the ceiling
4)
Install PCB and perform wiring
(see sec.
8
)
5)
Perform AC-channel and IR-channel testing
(see sec.
9
)
8 WIRING
Perform wiring to detector`s terminals in
accordance with control panel operating manual.
TMP
–
detector tampering control terminals;
RELAY-PIR, RELAY-GB
–
terminals for detector
connection to alarm loop;
+12V, GND
–
power supply terminals.
9 TESTING
AC-channel:
1)
Remove jumpers from
Mem
and
GB
plugs,
install jumper on
Ind
plug.
2)
Power detector ON. LED starts flash during
60
sec.
3)
During this time close shortly
Тst
plug using
screwdriver.
AC-channel TEST
mode switches
for
8 min.
4)
Close detector.
5)
Apply non-destructive
strike to the most distant
part of the protected
glass.
6)
At
the
detection
moment LED should light
up for
4s
and relay
shou
l
d
open (check with
control panel) or LED should double-flash one
time
.
IR-channel:
Perform
TEST-pass.
To detect sensitive zones
pass through detection
zone with the speed of
0.3-3 m/s. Make sure the
"Alarm - IR"
notification
is issued with each pass
.
10 WARRANTY
The operation warranty period is 5 years from the date
of operation start-up but no longer than 5 years 6
months from the date of manufacturing
subject to the
requirements of Operating Manual.
Glass
3
5
c
m
Hook