USE AND INSTALLATION MANUAL ELFO
28
INSTALLATION
4.8 PREPARING PIPE REFRIGERATION
4.9 PATH OF PIPES
4.10 EXTRACTION AIR IN PIPES AND COOLING UNIT EVAPORATING
WARNING FOR THE TIGHTENING OF THE VALVE IS ESSENTIAL TO USE
A SECOND KEY.
Only use copper pipes as “cold” and that fit each model. The
“gas pipe” and the “liquid tube” must be absolutely isolated
with an insulator of 6 mm. of minimum thickness. Insert the
flare nuts on the ends of the tubes before you prepare them
The radius of curvature of the pipes must be equal to or
greater than three and a half times the diameter to the tube
axis. Do not bend the pipe more than three times in a row
and not make more than 10 bends on the total length of the
connection. In the case where there is a height difference
The refrigerant charge is contained only condensing unit.
The Internal unit contains a small amount of neutral gas.
with a flaring tool. The insulated pipe separately with the
respective fittings can then be bound to the evacuation pipe
of the condensate and to electric cables by means of cable
ties.
between the evaporating unit and the condensing unit greater
than 5 m. it will be mandatory to prepare a siphon every 3
m. The siphon must have a radius of curvature as tight as
possible.
Therefore, after making the connections will be imperative to
extract the air contained in said links and Internal units.
4.12 COOLING CONNECTIONS
4.7 DRAINAGE PIPE
The refrigerant connections are made on the connections
located on the right side of the machine.
When the unit is in heating, the condensation water produced,
must be forced out through the appropriate hole of drainages
oposto on the bottom of the machine, by installing the joint
drainage so that the water can exit. Remember that the flow
is gravity.
To connect the joint water drainage:
1. Connect the coupling of external drainage in the hole in the
frame, as shown in the picture below.
2. Connect the discharge tube into the discharge mouth
drain hole
4.11 ADJUSTMENT OF REFRIGERANT CHARGE
In function of the connection length independent way, it may
be necessary to top up the refrigerant charge (the condensing
units are preloaded to a 5-meter line). This operation must be
performed by qualified personnel and in good standing of
the art refrigeration engineer. The completion of charging is
introduced through the fitting service valve Flare of condensing
(big road). If the refrigerant line is less than 5 m. “Download”
the amount of excess refrigerant. Any intervention on the
refrigerant circuits imply compliance elle recommendations
elative disposal of R
32
in the environment (according local
regulations).
14
Step 1: Fix the support of outdoor
Select it according to the actual installation situation
1. Select installation location according to the house structure.
2. Fix the support of outdoor unit on the selected location with expansion screws.
Note:
● Take sufficient protecttive measures when installing the
outdoor unit.
● Make sure the support can withstand at least four times
of the unit weight.
● The outdoor unit should be installed at least 3cm above
the the floor in order to install drainjoint.
● For the unit with cooling capacity of 2300W~5000W, 6
expansion screws are needed; for the unit with cooling
capacity of 6000W~8000W, 8 expansion screws are
needed; for the unit with cooling capacity of 10000W
~16000W, 10 expansion screws are needed.
Step 2: Install drain joint
(Only for cooling and heating unit)
1. Connect the outdoor drain joint into the hole
on the chassis, as shown in the picture below.
2. Connect the drain hose into the drain vent.
Step 3: Fix outdoor unit
1. Place the outdoor unit on the support.
2. Fix the foot holes of outdoor unit with bolts.
at least 3cm above
the the floor
drain joint
foot holes
Installation of outdoor unit
Step 4: Connect indoor and outdoor pipe
1. Remove the screw on the valve cover of
outdoor unit and then remove the valve
cover.
2. Remove the screw cap of valve and aim
the pipe joint at the bellmouth of pipe.
valve cover
liquid valve
gas valve
support holes
drain
The connections for the refrigerant lines are of the “flare”.
bottom