Teknion YMSTR Installation Manual Download Page 1

Mast Dynamic Arm with Bolt Thru Mount (YMSTD) and

Mast Dynamic Arm Light with Bolt Thru Mount (YMSTX)

Part and Product Identification

Section:
Description:

Page No: 

Date: 

Rev. No:  7

MAST DYNAMIC ARM - BOLT THRU MOUNT 

ERGONOMICS AND ACCESSORIES

Sep 2021

1 of 7

COM_210a

VESA
PLATE

A

C1

C2

C3

C4

Mast VESA Plate

(N09-5826) x1

- Dynamic Arm (N09-5874) x1

- Single Arm Stanchion

      (N09-5875) x1

      OR

NOTE: Mast Single Dynamic
Arm shown.
Please refer to Page 7 and 8 for
Monitor Removal.

C4 

- M12x1.75 SHCS

        90mm Bolt
        (MST-164) x1

OR

        M12x1.75 SHCS
        80mm Bolt
        (MST-165) x1

C3 

- M12 Fender Washer

        (MST-107) x1

C2 

- Through Clamp

        Cover Plate
        (MST-143) x1

C1 

- Mast Stanchion

        Base Through
        Clamp
        (MST-069) x1

C - Bolt Thru Mount (D06-4176) x1

- M4x10mm Pan Head

       Machine Screw
      (E01-1096) x4

- Black Spacer

     (E03-0806) x4

- M4x16mm Pan Head

     Machine Screw
     (E01-0999) x4

VESA Plate Mounting Kit(optional)

(must be ordered seperately)

- Dual Arm Stanchion

      (N09-5876) x1

G

Summary of Contents for YMSTR

Page 1: ...Stanchion N09 5875 x1 OR NOTE Mast Single Dynamic Arm shown Please refer to Page 7 and 8 for Monitor Removal C4 M12x1 75 SHCS 90mm Bolt MST 164 x1 OR M12x1 75 SHCS 80mm Bolt MST 165 x1 C3 M12 Fender...

Page 2: ...n drawings See Application Guide for Guidelines NOTE Make sure the distance from the back edge of the Worksurface to the center of the drilled hole is minimum of 3 STEP 3 Place Stanchion onto die cast...

Page 3: ...urning the Knob clockwise STEP 4 Mount Arm onto the Stanchion Section Description Page No Date DYNAMIC ARM ASSEMBLY VESA PLATE ASSEMBLY COM_210a 3 of 7 Sep 2021 Descriptions ERGONOMICS AND ACCESSORIES...

Page 4: ...hole STEP 5b This step is optional If inserts in the monitor are recessed use longer Screws and Spacers Ordered Separately Section Description Page No Date VESA PLATE ASSEMBLY OPTIONAL INSERT VESA PL...

Page 5: ...ICS AND ACCESSORIES STEP 8 Hold arm in desired position adjust the Spring Loaded Counterbalancing Load on top of Stanchion Hub until Arm stabilize at the position NOTE Rotate Allen Key to direction fo...

Page 6: ...monitor to the highest position and make sure the arm is fully extended STEP 2 Disconnect unplug all cables connected to the monitor Section Description Page No Date CABLE MANAGEMENT EXTEND DYNAMIC AR...

Page 7: ...the quick release override set screw if this has been tightened Ensure the Library Green safety latch is oriented upward NOTE Do not push Dynamic Arm down and let go when the monitor has been removed...

Reviews: