![Teknion Navigate Ceiling Feed HNBECF Installation Manuals Download Page 3](http://html.mh-extra.com/html/teknion/navigate-ceiling-feed-hnbecf/navigate-ceiling-feed-hnbecf_installation-manuals_1076918003.webp)
STEP 2a: After installing Mid-Gable, attach and align Lower Power Pole to Connecting Bracket
as shown
STEP 1a: Install Connecting Bracket to the Underside of the Stretch Bar
Section:
Page No:
Date:
CONNECT BRACKET ASSEMBLY (STANDARD)
ATTACH LOWER EXTRUSION (STANDARD)
HABN_322b
3 of 9
May 2022
ELECTRICS
height-adjustable bench
Installation Guides
B5B
B5A
B2
NOTE: Install Connection
Bracket then proceed Mid-
Gable Installation
NOTE: Cable Channels
hidden for illustration
NOTE: Cable Channels
hidden for illustration