background image

Section:

Date: May 2019

CEREBRO

complements

 

Installation Guides

Page: 7 of 10

COM_602

10

7

12

13

12

INSTALL VESA PLATE

STEP 8: Fasten VESA Plate onto Monitor.

STEP 9: Mount Monitor on the Swerv Arm.

MOUNT MONITORS

Summary of Contents for complements CEREBRO

Page 1: ...2019 CEREBRO ELECTRICS FOR IC complements Installation Guides Rev 00 Page 1 of 10 COM_602 10 9 8 7 5 4 3 1 12 NOTE To optimize Cerebro assets refer to Teknion Navigate User Guide Swerv Integrated Cere...

Page 2: ...n Guides Page 2 of 10 COM_602 ITEM NO PREVIEW DESCRIPTION PART NUMBER QTY 1 SWERV IC ACTUATOR KIT N09 9181 1 ITEM NO PREVIEW DESCRIPTION PART NUMBER QTY 2 MOTOR CABLE PVC FREE 500MM N09 8402 05 1 3 CE...

Page 3: ...WERV IC HARDWARE KIT X05 0500 6 1 M5 X 0 8 50MM SHCS E01 1285 4 6 2 SCRW 1 4 20X5 8 ZNC PN QD MCHN 690150 E01 0992 2 ITEM NO PREVIEW DESCRIPTION PART NUMBER QTY 7 SWERV IC STATIC ARM CASTING A25 0650...

Page 4: ...age 4 of 10 COM_602 1 6 2 3 SECURE CEREBRO ACTUATOR KIT STEP 1 Place the Actuator underneath the worksurface using the screws provided STEP 2 Before placing grommet cap run large wires through the gro...

Page 5: ...RO complements Installation Guides Page 5 of 10 COM_602 6 1 4 1 5 4 SECURE BASE CASTING STEP 4 Using screws provided secure the Base Casting into place STEP 5 Place Casting Cover over top of the Base...

Page 6: ...es Page 6 of 10 COM_602 8 7 5 7 10 7 ASSEMBLE SWERV IC STATIC ARM CASTING STEP 6 Using the screw secure the Swerv IC Static Arm Casting Tighten the screw with the allen key STEP 7 Connect the Dynamic...

Page 7: ...tion Date May 2019 CEREBRO complements Installation Guides Page 7 of 10 COM_602 10 7 12 13 12 INSTALL VESA PLATE STEP 8 Fasten VESA Plate onto Monitor STEP 9 Mount Monitor on the Swerv Arm MOUNT MONIT...

Page 8: ...so that monitor floats at all heights Increase lift strength by turning the allen key counter clockwise if monitor does not stay up when raised NOTE Adjust arm so that monitor floats at all heights De...

Page 9: ...USTING ARM NOTE For more detailed balancing tighten bottom screw in 1 2 turn increments to provide a specific balance STEP 8 Install display and power cable as shown above Run Display Cords through St...

Page 10: ...on Navigate User Guide for details 6 NOTE Connect the cables to the control box by connecting the Monitor Arms YMSZ to Channel 3 and connecting the remaining cables for YCH to the appropriate Channels...

Reviews: