background image

Maintenance ED2DF

SPARE PARTS:
 (See ASSEMBLY)
 
 TECHNICAL INFORMATION:
 
 Drinking nozzle:
 Max. working pressure: 5.5 bar
 Min. working pressure: 0.5 bar
 Recommended working pressure: 3.5 bar
 
 Connection to water:
 The amount of water must not be restricted with a
shut-off valve,as this may cause leaks from the
drinking nozzle.
 
 SERVICING IN THE EVENT OF LEAKS:
 
 Leaks by the spout of the drinking nozzle: may be
caused by a damaged O-ring or dirt under O-ring JR2:
Clean piston P312U included in KBP311N.
 Apply some grease around the piston before
assembly. If the O ringJR2 is damaged, the entire
drink nozzle should be replaced.
 
 Leakage under the pressure button: most
likelycaused by a damaged or dirty O-ring, JR1:
 Clean the piston P312U included in KBP311N.

 Apply some grease around the piston before
assembly. If the O ringJR1 is damaged, the entire
drink nozzle should be replaced.
 

MAINTENANCE:
 
 In order for the product to retain its original quality
and appearance, regular cleaning is recommended.
Use mild soap or products specifically designed for
stainless steel and clean water. Then wipe the surface
with a dry cloth.
Never use detergents containing chlorine, iodine,
fluoride or abrasives. Also avoid contact with acidic
solutions and other substances incompatible with
stainless steel. Remember that foodstuffs and skin
care products may contain such substances; e.g.
ketchup, juice, salt, some cleansers, nail polish, etc.
Promptly remove spills of such products.

 * Do not allow water or other liquid to dry in. This is
to avoid staining the surface.
 * Even though stainless steel can withstand harsh
treatment, it will easily be scratched by sharp objects.
For products with polished (brushed) finishes, this
will be very visible when the product is new, but after
a period of use, this will be negated as the steel loses

3

FDV Revision 20151215

www.intra-teka.com

Reviews: