17
GB
Installation
Sealing
Before installation, correctly insert the sealing unit delivered with
the hob. In addition, make sure that no liquids can penetrate
between the edge of the hob and the worktop or between the hob
and the wall and come into contact with any electrical appliances.
When installing a hob into a worktop with a ceramic or similar
covering (tiles etc.), the sealing on the hob is to be removed and
the sealing between the hob and worktop carried out with plastic
sealing materials, such as heat-resistant silicone rubber (not
included in delivery).
Working surface cut-out
Cut out the worktop recess accurately with a good, straight saw
blade or recessing machine. The cut edges should then be sealed
so that no moisture can penetrate.
The area is cut out as illustrated. The back wall should be open if
possible.The intermediary shelf must have an opening of approx.
10 x 10 cm at the back on the left for pushing the mains cable and
the gas connection tube through.
Important!
There is a risk of breakage if the hob is canted or subjected to
stress during installation!
Minimum distance to adiacent walls
Cut-out dimension
Outer dimensions of hob
Assembly instructions
GKS 290 ...
Gas
GKS 300 ...
Gas
Dimensions in mm
GKS 300
GKS 290