TOWER BOLLARD™ (TWB)
Max. 3/4”
1. Adjusted anchor bolts to project no more than
3/4” above the anchor plate after installation. The
three (3) 1/4-20 nuts on top of the plate may be
left in place while concrete is poured.
Finished grade
Finished grade
Finished grade
3. With the conduits in place and the anchor
plate properly positioned, secured and leveled,
concrete may be poured.
Finished grade
Finished grade
Finished grade
2. Install anchor plate and bolt assembly flush
with the finished grade. Run conduit inside
of the anchor plate center hole prior to
pouring concrete. The conduit may project
above the finished surface of the concrete
by 3/4” maximum. Max of four (4) 3/4” trade
size conduits may be positioned inside anchor
plate center hole prior to concrete pour.
Anchor #36 Installation
4. The fixture may be installed by removing the
three (3) 1/4-20 nuts and re-using them with
wrench to secure the fixture mounting base
assembly. See fixture installation sheet(s) for
additional information.
Soil Prep
Conduit
trench
B. Dig hole 10” wide and 24” deep.
Conduit
Trench
Excavated
for Anchor Kit
C. Prep soil according to DIG-IT Guide.
A. Determine Soil Type by referencing DIG-IT Guide.
Prep soil according to DIG-IT Guide.