![tefen InjectRite User Manual Download Page 4](http://html1.mh-extra.com/html/tefen/injectrite/injectrite_user-manual_1075375004.webp)
Page | 4
Kibbutz Nahsholim 3081500, Israel
Tel. 972 4 6395554 | Fax. 972 4 6390813 |
2.6.3.
Switching between options by pressing: MODE
+ - + -
Set the dosage rate as follow:
2.6.4. Press
M
ode
2.6.5. Change the dosage rate by pressing the -
/ +
buttons.
2.6.6. Set the required rate by pressing
Mode
again
2.7. Open the line's water flow and press (constantly) on
Prime
, until the suction tube is
filled with additive.
2.8. Now the pump is operating automatically, according to the water flow rate. When the
mainline valve is closed, the pump will stop.
2.9. Every time the water meter sends an input signal, the top LED blinks green and the
pump should work
2.10. Pump displays:
2.10.1.
XXX
– Flow rate
2.10.2.
GHP- Gallon per Hour (1:xx)
2.10.3.
L-H
– Litter per Hour (%)
Display
Input units
U1
Pulse / 1 Gallon
U01
Pulse / 0.1 Gallon
Eu
Pulse / 1 Litter