TECO TME-L-PIR-220 Manual Download Page 3

Infrared pir motion sensor switch installation  

Connection-weir sketch diagram 

• 

 

Switch off the power. 

• 

 

Please moving the upper cover with anti-clockwise whirl as per the diagram in 
the crust. 

• 

 

Fix the bottom on the selected position with the inflated screw 

• 

 

Connecting the power and the load to sensor as per the connection-wire 
sketch diagram. 

• 

 

Buttoning the upper cover on the sensor, whirling the cover with clockwise 

Test 

• 

 

Turn the LUX knob clockwise on the maximum(sun), turn the TIME knob anti-clockwise 
on the minimum, turn the SENS knob clockwise on the maximum. 

• 

 

When you switch on the power, the controlled load and indication lamp are both not 
working. Preheat 30 seconds later, the load and the indicator lamp are turned on syn-
chronization, in the absence of no inductor signals, the load should be stopped working 
within 5-30sec, the indicator lamp is turned off. 

• 

 

After the first is out, make it sense again after 5~10sec. The load should work. When 
there is no inductor signals in the indicator lamp, the load should be stopped working 
within 5-15sec. 

• 

 

Turn ambient light knob anti-clockwise on the minimum. If it is adjusted in the less than 
3LUX, the inductor load should not work after load stop working. If you cover the detec-
tion window with the opaque objects (towel etc), the load work .under no induction signal 
condition, the load should stop working within 5-15sec. 

        Ceiling-mount PIR sensor  

www.tecomat.cz | Teco a.s., Havlíckova 260, 280 02, Kolín 4, Ceská republika | [email protected] | www.tecomat.com

 

Reviews: