TECNOVAP 4W04010 User Instruction Download Page 26

 

    

STEAM BOX 

PROFESSIONAL

 

 

Pag

. 26 

TECNOVAP  06/15 

 

9. 

MAINTENANCE 

9.1. MAINTENANCE OF THE BOILER

 

ATENTION 

DISCONNECT  THE  UNIT  FROM  THE  ELECTRICAL  POWER  SUPPLY  BEFORE  CARRYING  OUT  USER 

MAINTENANCE.  

ATTENTION. BURNING DANGER 

The boiler cleaning must be carried out when the equipment  has cooled down (i.e. switched off 

for  at  least  5  hours)  -  for  this  reason  we  suggest  to  maintain  the  boiler  in  occasion  of  the 

following use, as long as at least 5 hours have passed. Please proceed as follows:  

 

 

The  device  is  equipped  with  a  maintenance  advise  system,  which  every  20  effective  working  hours 

displays 

the advice “C A L C” to warn the user to proceed with the boiler cleaning.  

When this advice appears  on the display it is still possible to use the unit until the end of the cleaning 

process; then, it will be necessary to switch the unit off by turning the main switch and unplugging the 

power cable.  

Place  a  recipient  under  the  machine,  remove  the  boiler  drain  cap  (12)  and  wait  until  the  boiler  is 

completely emptied. 

Clean eventual residuals from the cap with running water, check the efficiency of the gasket located on 

the bottom of the cap and, if necessary, substitute it (please contact your supplier for the spare parts). 

Close the drain cap again. 

Using water with hardness higher than 10 French degrees, (according to the usage of the unit, > 2 hours 

/  day)  it  is  necessary  to  use  water  treated  with  a  proper  water  softener  system,  which  can  reduce  the 

calcium  carbonate  up  to  less  than  4  French  degrees,  increasing  by  consequence  the  liability  of  the 

steam generator. (for any further details or to buy a water softener system, contact your supplier).  

Open the caps (10A) and (11A) and, if necessary, clean the filters (10B) and (11B) with water. Insert the 

caps with their filters into the respective seats, making sure that their gaskets are correctly positioned on 

the bottom.  

The cleaning of the boiler is completed, insert the power cable (1) into a suitable plug and activate the 

main switch (4) and the switches                     . It is recommended to activate also the minimum steam 

switch  (36  on  July  and  Radames)  on  the  handgrip,  pressing  also  the  safety  switch  (34  on  July  and 

Radames  or  83  on  Geyser)  to  allow  the  outlet  of  the  air  remained  in  the  empty  boiler.  Wait  until  the 

refilling system has finished (approx. 3 minutes). 

The  maintenance  of  the  boiler  is  completed;  proceed  with  the  using  instructions  as  described  in  the 

paragraph (h) of the chapter 8.  

 

Summary of Contents for 4W04010

Page 1: ...STEAM BOX PRO USER INSTRUCTION With integrated industrial vacuum cleaner Standard Bacchus With vacuum cleaner...

Page 2: ...STEAM BOX PROFESSIONAL Pag 2 TECNOVAP 06 15...

Page 3: ...EAM GENERATOR READ AND FOLLOW THIS INSTRUCTION MANUAL IT IS RECOMMENDED TO KEEP THIS INSTRUCTION MANUAL TO CONSULT IT LATER OR TO GIVE IT TO THE FOLLOWING OWNERS PLEASE READ THE SAFETY INSTRUCTIONS ON...

Page 4: ...ERED TO THE CENTERS SUITABLE FOR THE DISPOSING OF THE WASTE ELECTRIC AND ELECTRONIC EQUIPMENT BATTERIES OIL AND SIMILAR SUBSTANCES MUST BE RECYCLED IN THE PROPER RECYCLING CENTERS AND MUST NOT BE LEFT...

Page 5: ...the safety of the machine itself in case other primary control devices are inefficient due to a failure Due to the extreme importance of these components and as not to compromise the safety of the ma...

Page 6: ...s not intended to be used by children or by unqualified persons Monitor the children so they cannot play with the machine ATTENTION To ensure the machine s safety use only original spare parts from th...

Page 7: ...ONNECTION TO THE WATER NET The connection to the water net shall be made by qualified personnel It is recommended to use a new set of food grade fittings and food grade hoses it is not possible to use...

Page 8: ...ional This product is equipped with a dependable stainless steel boiler with automatic refilling system which allows it to produce a powerful and continuous supply of steam 24 24 hours STEAM BOX PROFE...

Page 9: ...0 10 0 14 4 20 75 Rated Power vacuum kW 1 0 1 2 3 0 Max Rated Power kW 11 0 14 8 22 0 29 2 36 4 11 0 17 8 22 0 32 2 39 4 11 1 15 8 22 15 Rated Steam Pressure kPa bar 1000 10 Permissible Steam Pressure...

Page 10: ...ower kW 11 0 14 8 22 0 29 2 36 4 Rated Steam Pressure kPa bar 600 6 Permissible Steam Pressure kPa bar 1200 12 Max Steam Rated Flow g min 291 388 582 776 970 Max Steam Rated Flow Kg h 17 5 23 0 35 0 4...

Page 11: ...m hose outlet 70 Steam hose w handgrip 16 Locking latch vacuum outlet 71 Steam lance 17 Base for vacuum drum 72 Rectangular brush 18 Vacuum drum 73 Cloth holder 19 Clamping hooks for vacuum motor 74 T...

Page 12: ...OFESSIONAL Pag 12 TECNOVAP 06 15 7 TECHNICAL DRAWINGS 6 7 8 9 10 11 10B 11B 12 13 10A 11A 4 2 1 5 3 Steam Box Professional 2 SINGLE POWER MULTI POWER STEAM BOX PROFESSIONAL Steam Box Professional AD44...

Page 13: ...lircisml erga kvglircisml erga kvglircisml erga kvglircisml erga kvglircisml erga kvglircisml erga kvglircisml erga kvglircisml erga kvglircisml erga 1 5 19 17 18 21 3 Steam Box Industrial Steam Box I...

Page 14: ...11 10B 11B 12 13 20 22 25 10A 11A 4 2 1 5 19 17 18 21 16 15 3 2 SINGLE POWER MULTI POWER STEAM BOX PROFESSIONAL CON ASPIRATORE INTEGRATO Steam Box Professional Steam Box Professional AD4401M AD40010...

Page 15: ...kvg lirc ism l e rga kvg lirc ism l e rga kvg lirc ism l e rga kvg lirc ism l e rga kvg lirc ism l e rga kvg lirc ism l e rga kvg lirc ism l e rga kvg lirc ism l e rga 1 5 3 Steam Box Bacchus 2 SINGL...

Page 16: ...STEAM BOX PROFESSIONAL Pag 16 TECNOVAP 06 15...

Page 17: ...STEAM BOX PROFESSIONAL Pag 17 TECNOVAP 06 15 KIT GEYSER 10 bar JULY 10bar ACCESSORIES ONLY FOR MODELS 10 8 kW e 14 4 kW...

Page 18: ...h warning lights Power button Powers the electronic components steam solenoid valves and boiler refilling pump Boiler activation button Activates the heating elements the detergent pump and the overhe...

Page 19: ...tton The unit automatically recognizes the inserted Bacchus hose and activates steam activation buttons on the control panel and the heating elements If there is no water inside the boiler the LED lig...

Page 20: ...fill in first the detergent to obtain a better mixing Please be careful with the detergent to be used as some available in commerce will emanate highly toxic gases when heated above 100 C Always consu...

Page 21: ...about the ordinary maintenance period the system has been programmed in order to warn each 20 effective working hours steam solenoid valve on Proceed as described in the section 9 1 boiler maintenance...

Page 22: ...oth detergent and hot water injection functions have to be activated at intermittence for ex 20 seconds ON 20 seconds OFF both functions have not to be used in continuous duty Attention Using the swit...

Page 23: ...ted for a few seconds at a time to avoid excess liquid with the steam to spray hot water please refer to the below described mode by activating the switch 35B Both detergent and hot water injection fu...

Page 24: ...9 90 91 or the window cleaner 86 on the lance according to the cleaning job to be performed Your lance is ready for use Use the lever 83 on the handgrip to activate steam flow If necessary push the bu...

Page 25: ...ximum steam in base of desired steam quantity Automatic switch on programming Press the button in order to switch the appliance off Press the button and keep it pressed until the display starts to fla...

Page 26: ...n the bottom of the cap and if necessary substitute it please contact your supplier for the spare parts Close the drain cap again Using water with hardness higher than 10 French degrees according to t...

Page 27: ...sed the detergent button 35 on July and Radames or 82B on Geyser and press the steam command safety switch 34 on July and Radames or 83 on Geyser located on the hose then press the switch on the contr...

Page 28: ...M BOX PROFESSIONAL Pag 28 TECNOVAP 06 15 9 3 MAINTENANCE OF THE TOOLS Grease occasionally joints on the extension tubes and on the accessories PG5116 PG5106 OR 9 25x1 78 OR 6 75x1 78 PG5123 OR 29 82x2...

Page 29: ...nserted into the socket 14 B Clean the vacuum tube and the accessories used C Empty the vacuum drum Steam does not come out A Boiler has not reached yet the operational pressure light is off B Steam s...

Page 30: ...problem will cease If it continues proceed to the cleaning of the boiler Noise inside the generator The boiler getting cold after about 6 7 hours creates an internal depression which at each ignition...

Page 31: ...specifications of directives 2006 95 CE 2004 108 CE 2006 42 CE 2002 95 CE Per il controllo della conformit alle sopraindicate direttive sono stati seguiti i seguenti standard For the checking of conf...

Page 32: ...STEAM BOX PROFESSIONAL Pag 32 TECNOVAP 06 15 Ordinary maintenance procedures Generator working hours Frequency of intervention Notes...

Page 33: ...STEAM BOX PROFESSIONAL Pag 33 TECNOVAP 06 15 Extraordinary maintenance procedures Generator working hours Date of intervention Intervention description replaced components etc...

Page 34: ...STEAM BOX PROFESSIONAL Pag 34 TECNOVAP 06 15 NOTES...

Page 35: ...STEAM BOX PROFESSIONAL Pag 35 TECNOVAP 06 15...

Page 36: ...STEAM BOX PROFESSIONAL Pag 36 TECNOVAP 06 15 THE MANUFACTURER RESERVES THE RIGHT TO BRING TECHNICAL AND STRUCTURAL IMPROVEMENTS WITHOUT PRIOR NOTICE...

Reviews: