background image

 

7

instructions, laws and regulations. 

        The  instructions  are  drawn  up  by  EASY 

BEST.  Safety  rules  in  this  manual  can  be  defined 

due to local laws in different country and region   

      They  must  have  had  actual  training  on  the 

operations  to  be  performed.  Maintenance  workers 

must have read the instructions in this manual and 

be familiar with all the commands so that they can 

work  in  full  compliance  of  the  safety  regulations 

currently in force. 

      They  must  not  be  drug  or  alcohol  abusers.  A 

technician who uses prescription drugs must obtain 

medical  advice  on  his  ability  to  conduct  certain 

types of activities. 

 

8.3 Clothing   

          Before 

starting 

any 

work 

operation, 

maintenance  workers  must  wear  suitable  clothing. 

All the instruments that are used must be in perfect   

condition and be type tested.   

        The  maintenance  worker  must  ALWAYS 

check  the  supplied  devices  and  replace  them  if 

they are damaged or are not compliant. 

 

WEAR PROTECTIVE GLOVES

 

 

 

WEAR  GOGGLES  (DURING  WELDING 

WORK

   

 

 

WEAR SAFETY SHOES

 

 

 

WEAR  WORK  OVERALLS  WITHOUT  ANY 

LOOSE ENDS

 

 

8.4 Cleaning the ice cream machine 

It  is  necessary  to  clean  the  barrel  before  and 

after  operating  the  machine.  Furthermore,  the 

barrel  must  be  properly  cleaned  up  with  warm 

water after being disinfected. 

As  shown  in  the  picture  below,  every  time 

before or after making ice cream, the mixed part of 

the  machine  must  be  screwed  off  and  disinfected 

properly so that to ensure the quality of ice cream.. 

(Screw  off  the  nut  on  the  top  and  then  pull  the 

mixed part upwards) 

 

 

 

 

 

 

 

 

 

 

 

 

 

For external cleaning, just use clear water to add a 

few washing liquid such as detergent, soap, etc 

 

ATTENTION 

 

1.

 

For  the  water  to  clean  the  machine,  the  ideal 

temperature  is  55 

.  The  water  temperature 

is  no  more  than  60 

  and    not  be  below 

45 

.  For  spare  parts  removed,  they  have  to 

cleaned by hand and do not use the automatic 

washing machine to clean 

2.

 

NEVER use inflammable or abrasive products., 

or  will  damage  the  spare  parts  and  pollute 

production area. 

 

8.5 CLEANING THE CONDERSER 

 

          The  condenser  must  be  cleaned  every  30 

days  maximum  and  this  involves  removing  the 

dust that collects in the fins. 

IMPORTANT:   

1).Disconnect  power of the  ice cream  machine, to 

clean the condenser side fin with a stiff brush. 

2).Don't use liquid to clean the condenser 

 

 

 

 

Summary of Contents for IC3

Page 1: ... VERTICAL BATCH FREEZER INSTRUCTION MANUAL IC3 Sincerely thank you for choosing our machine Please read the manual carefully before operate When finish reading please properly keep manual and warranty card English ...

Page 2: ...nual Always refer to the manual before carrying out any operation Safeguard this manual and make sure it is always available next to the machine or nearby The diagrams and drawings are furnished by example In pursuance to its policy of constant development and updating The manufacturer may make any changes without giving advance notice This manual must be kept for the entire life of the machine If...

Page 3: ...VERTICAL BATCH FREEZE P3 5 INVISIONED USE P4 5 6 POSITIONING P5 7 INSTALLATION AND USE OF THE ICE CREAM VERTICAL BATCH FREEZER P6 8 MAINTENANCE P6 7 9 TROUBLESHOOTING P8 10 DISMANTLING P8 11 CUSTOMER FILE CARD P9 12 CONTACT US P10 ATTENTION The content such as shape material and color can be changed without prior notice because of products continuously improved INDEX ...

Page 4: ...gredients Flexible and removable agitator blade that touch very well the cylinder to mix the ice cream perfectly 1 4 Microcomputer control system digital display easy to operate 1 5 Direction wheels with brake for easy moving 2 TECHNICAL DATE Ice Cream Machine Range IC3 External Dimension L W H mm 547 552 430 Max Amount Per Batch Liter 2 Working Cycle min 15 20 Hourly Production Liter Hour 6 8 Ref...

Page 5: ... which they were originally placed by the respective manufacturers 3 1 INTENDED USER OF THE INSTRUCTION MANUAL This instructions manual is intended for the following personnel shipping loading and unloading staff operators installers maintenance personnel 3 2 OBJECTIVES OF THE INFORMATION IN THE MANUAL The purpose of this manual is to indicate how the machine should be used based used design It wi...

Page 6: ...of the report to the manufacture or area representative 4 4 PACKING MANAGEMENT All the unpacked materials can be recycled in order to dispose of according local legalization Be sure to destroy plastic components to prevent any hazards suffocation to children 4 5 PERSONNEL REQUIREMENTS We recommend that the operations to move the ice cream Vertical Batch Freezer should be handled by personnel accus...

Page 7: ...roperly trained before operating the machine Please read the instruction manual carefully before using the machine Operating without complying with the use regulations might case the occurrence of accident Accurate installation of all the components and accessories must be ensured and verified feasible for the proper use of the ice cream Vertical Batch Freezer 5 3 COMPONENTS INTRODUCE Condenser un...

Page 8: ...fications that may be needed 6 1 Make sure that ice cream is put on the desktop Horizontal 6 2 Make sure the normal heat radiation of the ice cream Vertical Batch Freezer nothing is to be placed in front of the heat discharge panel side panel No things Side back panel No things These two methods are prohibited discharge Furthermore please NEVER place the ice cream Vertical Batch Freezer at Door Wi...

Page 9: ...erify that the ice cream Vertical Batch Freezer is turned off and it is disconnected from the power mains Set up a sing indicating the work that is being done If necessary procure adequate lifting equipment Verify that the operations to be done will not injure person or damage machinery nearby 8 1 CLASSIFICATION OF INTERNVENTIONS Maintenance work falls into two categories Normal maintenance define...

Page 10: ...OOSE ENDS 8 4 Cleaning the ice cream machine It is necessary to clean the barrel before and after operating the machine Furthermore the barrel must be properly cleaned up with warm water after being disinfected As shown in the picture below every time before or after making ice cream the mixed part of the machine must be screwed off and disinfected properly so that to ensure the quality of ice cre...

Page 11: ...re to separate and identify mark all the components 10 2 5 Perfect organization during disassembly guarantees perfect and safe reassembly 10 2 6 All the material must be kept in a dry area that is protected against weather 10 2 7 Before remounting the machine check the material thoroughly for any damage FAULT CAUSE SOLUTIONS No supply voltage Main switch OFF Plug not connected Product exceeds load...

Page 12: ...you to fill in the following Product Name Product Type Ex work Code Purchase Date Usage unit Detailed address Telephone Fax Postal code Contact Tel Besides the document accompanied the machine if you need Further detailed technical data The latest product information Other product detailed information Your opinions The characteristic of the product All service after sale Others Warranty time start...

Page 13: ...081119 E email easybestchina qdtecmach com fax 86 0532 89081177 79 Http www easybest tecmach com hotline 86 0532 89089202 Http www easybest tecmach cn Due to the continuous improvement of the product the type shape material and color of the album are subject to change without notice ...

Page 14: ...11 ...

Reviews: