SE-4048
Fax
:021-66402031
Www.techs.is , [email protected]
Page
12
Installation rack requirements
Regardless of whether the switch is installed in a rack or other horizontal workbench, please note the
following:
1.
Verify that the rack or table is stable, strong, and capable of withstanding a weight of at
least 5.5 kg;
2.
Confirm that the rack itself has a good cooling system, or keep the room well ventilated;
3.
Make sure the rack is well grounded, and the distance between the power socket and the
switch is less than 1.5 meters.
tool preparation
The Phillips screwdriver, electrostatic wrist strap, and cable fiber may be used during installation.
3.2 Product Installation
19inch standard rack mount
The SE-4048-P300 is designed to fit the standard 19-inch rack and can be easily mounted to the rack.
The specific installation steps are as follows:
1.
Check the grounding and stability of the rack;
2.
Install the two L-shaped brackets in the accessories on both sides of the switch panel and fix
them with the screws provided in the accessories.
3.
Place the switch in the proper position in the rack and support it by the bracket. Fix the L-
bracket to the guide groove fixed at both ends of the rack with screws to ensure that the
switch is installed on the rack stably and horizontally.
Summary of Contents for SE-4048
Page 1: ...SE 4048 Version 1 0 May 2021 User Manual...
Page 16: ......