26
Leg Extension
04199025
Replacing the cable
-
insert the new cable beginning on
the adjuster side (follow the original
path of the cable as shown in the
figure);
W
ARNING
Pay close attention when
passing the cable through the
hole in the front panel of the
weight stack.
cont.
Identification of the manufacturer
and the equipment
Lifting and handling
the equipment
Replacing
the padded components
Replacing the cable
Removing
the weight stack panel
Contents