53
DE
EN
Illustration 17: Schematic of the intelligent control system
The energy meter (MID) should be installed immediately after the domestic electricity meter
(see Illustration ).
The cabling of the energy meter (MID) can be produced in accordance with the following
information.
Three phase
Single phase
Illustration 18: MID 3-phase
Illustration 19: MID 1-phase
Pins 22-23: A-B (COM) Modbus connection via
RS485 for a three-phase connection.
Pin 10-11: A-B (COM) Modbus connection via
RS485 for a single-phase connection.