Installation Instructions

By following these instructions carefully, your new hoist can be 
assembled quickly to give safe, smooth and efficient operation 
and an extended, trouble-free life.
Note: Use lifting equipment or extra people to lift & handle the 
heavy parts.

1. The hoist must be installed under cover on a flat concrete 
floor of minimum tensile strength Grade 25 MPa and minimum 
thickness 100 mm with at least one layer of F72 reinforcing 
mesh. The hoist must not be installed in a location where it is 
exposed to the weather or explosive or flammable materials. 
If  the floor is not satisfactory, a new concrete base with a 
minimum area of 3.7 x 1.6 m will need to be laid and allowed to 
cure for one month before installing the hoist.

2. Install a mains isolator switch on a wall or column next to 
where the hoist power column will be situated.
Note: This must be done by a qualified electrician.

For a three phase hoist, the power supply must be 415V, 50 Hz, 
rated to carry 15A full load current and 33A inrush. The wiring 
must be 3 core plus earth and a minimum 7-strand, 2.5 mm² 
cross sectional area copper. For long runs larger wiring may be 
required.

For a single phase hoist, the power supply must be 240 V, 50 Hz, 
rated to carry 23A full load current and 132A inrush. The wiring 
must be 2 core plus earth and a minimum 7-strand, 4 mm² 
cross sectional area copper. For long runs larger wiring may be 
required.

3. Unpack the hoist and place the base frame on the floor in the 
desired position to allow easy access for vehicles and leaving a 
clear 600 mm wide gap around the hoist for operator access.

Note: The drive column goes on the end of the base frame that 
has the angle iron fitted inside (refer Fig.1)

Inspect the floor where the four hold-down bolts will go. The 
hold-down bolts must not be installed within 200 mm of any 
edge, crack or other fastener in the floor.

4. Level the base frame by adding 50 mm square metal shims, 
with a 20 mm diameter hole in the centre, under the base frame 
at the four hold-down bolt holes. When level, add 200 x 100 mm 
metal shims under the base frame, as shown in Fig.1, to remove 
any gap but without lifting the four corners of the base frame off 
their shims.
Note: the maximum permissible gap between the base frame 
and shims is 0.5 mm.

5. Drill and fit four hold-down bolts. The bolts must be 16 
mm thread diameter and fitted in accordance with the 
manufacturer’s instructions:
Approved expanding-type masonry anchors – Ramset Trubolt 
T16125 and Hilti HSA stud anchor M16 x 140/25.
Note: The bottom edge of the expansion sleeve on the masonry 
anchor must be a minimum of 75mm deep in the concrete when 
tightened. If the base has been shimmed up a large amount, 
longer anchors will be required to ensure this depth is reached. 
Some authorities may not approve expanding type masonry 
anchors. Approved adhesive masonry anchors: Ramset Chemset 
capsule CHEM 16 and stud bolt M 16190 and Hilti adhesive 
cartridge HEAM 16 x 125 and anchor rod HASM 16 x 190.
Note: These fasteners require a minimum concrete thickness 
and hole depth of 125 mm.

6. Lay the drive chain in the base frame so that it runs between 
the chain rollers as shown in Fig.2. 
Note: The joining link spring clip must be on top.

7. At the drive column at the end of the base frame lay two 38 
mm thick x 400 mm long pieces of packaging wood along each 
leg of the U-shaped plate as shown in Fig.1. Position the drive 
column so it is laying on its back (as packed) with the column 
base plate on top of the wood.

8. Secure the chain limit switch (which comes out of the bottom 
of the column) out of the way, then stand the column up on 
the pieces of wood. Position the column so the bolt holes in the 
column and base frame roughly line up. Make sure the column 
is stable on the wood and is being held at all times to prevent it 
falling over.

9. Lay the chain limit switch and wiring in the base frame, 
with the wiring lying inside the angle iron and the switch on 
its mounting plate as in Fig.2. Reach under the column base 
plate and fit the chain on to the sprocket (it may be easier if the 
column is tilted back slightly). Keep holding the chain tight on 
the sprocket. Tilt the column from side to side and remove the 
pieces of packing wood (be careful it does not fall).

10. Bolt the column down using two M16 x 50 mm long and 
two M10 x 35 mm long high tensile bolts. Leave the M16 bolts 
undone about 4 mm (two turns). Fully tighten the M10 bolts 
with a ring or socket spanner, then tighten the M16 bolts fully 
with a torque wrench to 200NM (147 ft lbs).
Note: The bolts must be high tensile, identified by the marking 
‘8.8’ on the head of the bolts.

Fig. 1

Summary of Contents for TEC 3000X

Page 1: ...Installation Operation and Maintenance instructions 3000X Screw Hoist...

Page 2: ...ate the hoist and protect the operator should the electrics be damaged in any way In an emergency or when servicing turn the isolating switch to O and padlock it Do not directly spray or hose the hois...

Page 3: ...um permissible gap between the base frame and shims is 0 5 mm 5 Drill and fit four hold down bolts The bolts must be 16 mm thread diameter and fitted in accordance with the manufacturer s instructions...

Page 4: ...nd check the arm is locked 20 Fit the cover over the bottom limit switch and tee piece using two M6 x 10 mm long socket head cap screws Fit the motor cover over the vee belts and secure with the M4 x1...

Page 5: ...5 Safety Interlock Mechanism Three Phase Electrical Circuit Single Phase Electrical Circuit...

Page 6: ...ves 2 Check the vee belt tension Individual belt deflection must be less than 10 mm when pressed firmly in mid span with your thumb Every 3 months 1 Measure the gap between the lift and safety nuts in...

Page 7: ...mn 1 Thoroughly clean the inside of the column where the rollers and sliders travel then smear with grease 2 Refit the carriage and position it about 500 mm up from the bottom 3 Check the plastic key...

Page 8: ...earing incorrectly assembled a Bearing housing should be removed and bearing replaced 8 Interlock engaged a Lift nut worn out Replace as described under Major Service 3 Hoist runs but lacks power a Ho...

Page 9: ...nd nuts Drive pulley a Clattering sound coming from drive cover 1 Grub screw retaining motor pulley is loose allowing play a Tighten grub screw using Allen key Base frame a Chain noise 1 Chain not run...

Page 10: ...ing washer 4 24a V18663 Wire circlip 4 70a WWA1006 3 8 flat washer 4 24b V19268 Lift pad bush 4 71 SWA106 10 Screw 3 8 BSW x 1 1 4 L 6 25 V19274 Footguard spring 8 72 V18346 V18646 Motor mounting 1 25...

Page 11: ...11...

Page 12: ...back up safety interlock device will prevent further use of the hoist until the lift nut is replaced Daily Carry out a simple visual check to ensure the nuts have not completely closed up Every 3 mont...

Reviews: