![Teba TP-10 Installation Manual Download Page 8](http://html2.mh-extra.com/html/teba/tp-10/tp-10_installation-manual_4016384008.webp)
8
3.0
Installation and Connection
Product assembly must be installed by authorized person.
Pellet stove is a full automatic device. Switch, sensor and similar parts are located inside the stove
safely.
3.1.
Electricity
Electricity system should be 220V-230V/50Hz. Our company is not responsible for any problem which
occur in case sudden low or high volt.
Note: Keep plug of device on outlet during summer-winter.
3.2.
Chimney Connection
We advice steel chimney pipe for chimney connections. Pellet stove can be connected to multiple
chimney. Chimney can be given outside directly according to place of stove. Or can be connected
available chimney in short distance.
4.0
Control Panel
Summary of Contents for TP-10
Page 4: ...4...