9
4.1 Installation tool requirements
Tools required:
13mm and 10mm spanners, Allen Keys, Hacksaw, File.
4.2 Included parts list
Viper Power Cycle
Docking Tube with Plastic Liner.
Docking Tube Rear Fixing Brackets/Bolts/Nuts/Washers.
Docking Tube Front Fixing Brackets/Bolts.
Docking Tube Fixing Band.
Docking Tube Fixing Band Spacers/Bolt/Nut/Washers.
Docking Clamp Female complete assembled.
Docking Clamp Male complete assembled & pre fitted to the handcycle.