TDW France-22-E-03-09
4
Table of Contents
Paragraph
Title
Page
Section I: Introduction
1.0
Description
5
2.0
Scope of Applications
6
3.0
System Components
7
4.0
Safety
9
5.0
Equipment Orientation
9
Section II: Installation and operation of the TDW SHORTCUTT
10 inch valve
1.0
Introduction
10
2.0
Operating instructions
11
Section III: Tapping 315 and 355 mm Lines with the T-203 Tapping Machine
1.0
Introduction
13
2.0
General Information
13
3.0
Preparations
13
4.0
Tapping the Line
18
Section IV: Plugging the Line
1.0
Introduction
20
2.0
Plugging the Main Line
20
Section V: Setting the Completion Plug with the POLYSTOPP
Completion Machine
1.0
Preparing the completion machine
30
2.0
Installing the plug
31
3.0
Removal of the valve
32
Section VI: Maintenance
1.0
Introduction
34
2.0
SHORTSTOPP
II Plugging Machine
34
3.0
POLYSTOPP
completion machine
37
4.0
SHORTCUTT
valve
37
Appendix
Parts Lists
39
Summary of Contents for POLYSTOPP
Page 2: ...TDW France 22 E 03 09 2...
Page 26: ...TDW France 22 E 03 09 Figure 41 Lower Plugging Head...
Page 40: ...TDW France 22 E 03 09 Figure 64 T 203 Tapping Machine Parts List 1...
Page 43: ...TDW France 22 E 03 09 Figure 65 SHORTSTOPP II Dual Control Bar Assembly...
Page 45: ...TDW France 22 E 03 09 Figure 66 SHORTSTOPP II Jack Assembly...
Page 48: ...TDW France 22 E 03 09 Fig 67...
Page 50: ...TDW France 22 E 03 09 TO BE ADDED UPON NEW DESIGN VALVE LAUNCHING Fig 68...