TDS Fitness Equipment H-0540G-SPL Assembly Instructions Download Page 2

ASSEMBLY: You need two people since the unit requires perfect 
positioning and markings on the beam. 

Attach (1) Chin Bar to (2) Uprights with (2) 3/8” x 3” Hex bolts, (4) 3/8” 
Flat Washers and (2) 3/8” lock nuts. Hold the assembled bar to a strong 
wooden beam and then mark holes on the beam with a marker. 

Drill (4) pilot holes  into the beam using (3/16”) drill into the beam

 

from bottom position and then insert (4) 3/8” x 3” Lag bolts. Do not 
over tighten. Check the Chin Bar and Two Uprights positioned  for 90 
degree. 

Attach (2) Handles to (2) Uprights with (4) 3/8” x 3” Hex bolts, (8) 3/8” 
flat washers and (4) 3/8” lock nuts.
Check again the Chin Bar and Two Uprights well positioned  for 90 
degree. 

Then tighten all  bolts before you start your exercises.

CAUTION: Check the hardware every time, before you start using this 
Chin Bar to avoid injury

HARDWARE:
3/8” X 3” BOLTS - 6 PCS
3/8” X 3” LAG BOLTS - 4 PCS
3/8” FLAT WASHERS - 16 PCS
3/8” LOCK NUTS - 6 PCS

Reviews: