10
01/2013
TCS TürControlSysteme AG, TCS Hotline Germany: [email protected]
Subject to technical changes.
Fax: +49 (0) 41 94 / 9 88 129
www.tcsag.de
PI_AMI1xx00_uk
Installation of the front-door station (front panel)
rear view
Cut the enclosed front panel sealing for the
front-door station to length: first cut the up-
per, then the stripes for the sides.
Stick the cutted front panel sealing with small
distance to the outer edge onto the front
panel.
!
The lower side stays free and prevents
water from condensing within the system!
Screw the front panel with lock screws using
the allen key onto the flush-mount box.
Thus, the front panel sealing is compressed
and provides an adequate sealing against ex-
ternal influences.
Installation communication post K3xxxx
The installation is realised on a concrete foundation (or ground anchor) provided by cus-
tomer with heavy-duty anchors (enclosed in the delivery).
!
Please ensure that there is free space for the installation at the backside of the com-
munication post on the installation site.
We recommend to provide a cable length of 1 m on site.
Fix the post to the ground
!
Ensure that a line is available to the functional earth.
front panel sealing
countersunk screw