L2 Repair Document
TCL
Communication Ltd.
Rev.
ONE TOUCH 6055K/P/Y/B/H Level 2 Repair Document
Page
1.0
4/61
All rights reserved. Transfer, copy, use or communication of this file is prohibited without authorization.
1 Level 2 repair process
Reassembly
Record in BIG
End
OK
Retest
OK
OK
Start
Visual Inspection
Warranty Check
Pretest & Failure confirm
SW Upgrade
Disassembly
L2 Repair
Retest
Function test
PCBA Replace
NG
NG
NG
The user data will be clear in this step