
6
Twin City Engineering Supplement ES-895
Figure 8. Typical Horizontal Mounting to Rigid Foundation
ITEM
QTY.
DESCRIPTION
01
1
TSL or QSL Fan
02
4
Anchor Bolt*
03
8
Hex Nut*
04
8
Washer*
NOTE:
*1. Anchor bolts and hardware supplied by customer.
FLOOR RIGID
MOUNTING
AIRFLOW
2
4
3
1
Figure 7. Typical Vertical Mounting with Vibration Hangers
ITEM
QTY.
DESCRIPTION
01
1
TSL or QSL Fan
02
4
Spring Hanger*
03
4
Neoprene Washer
04
32
Steel Washer**
05
32
Hex Nut**
06
4
Threaded Rod
07
4
Hanger Rod**
NOTES:
*1. Spring hangers are optional accessories.
2. When spring hanger interferes with ductwork, add
offset to threaded rod to provide clearance.
**3. Hanger rods, nuts, and washers supplied by cus-
tomer.
7
4
5
4
2
3
6
5
1
4
6
SEE
NOTE 2
AIRFLOW