OPERATING PROCEDURES
6-5
Model C302
Operating Procedures
6
17. Place the large O-ring into the door groove and lightly
lubricate.
Figure 6-18
Note:
Every 4 months or less, discard the O-rings
and install new O-rings.
18. Install the front bearing.
Do not
lubricate the front
bearing.
Figure 6-19
19. Install the freezer door. Position the door on the four
studs on the front of the freezing cylinder. Firmly
push the door into place. Install the four handscrews
on the studs and finger-tighten them equally in a
crisscross pattern to ensure that the door is secure.
Do not
overtighten the handscrews.
Figure 6-20
20. Repeat step 1 through step 19 for the other freezing
cylinders.
Sanitizing
Important!
If a machine is sanitized and will not be
used for an extended period of time, clean water
should be used to flush all sanitizer from the lines.
Remove the water from all the lines and components
prior to storage of the machine. Upon return to
service, the machine must be sanitized prior to use.
Note:
The following instructions are for one side of
the machine. Each side consists of two freezing
cylinders, identified on the corresponding LCD as left
(L) and right (R).
1. Open the lighted display door. Place the control
switch in the ON position.
Figure 6-21
11502
11503
11504
13092
Summary of Contents for C302
Page 10: ...2 2 TO THE OPERATOR Model C302 To the Operator 2 Notes...
Page 14: ...3 4 SAFETY Model C302 Safety 3 Notes...
Page 40: ...7 2 OPERATOR CHECKLIST Model C302 Operator Checklist 7 Notes...
Page 44: ...9 2 PARTS REPLACEMENT SCHEDULE Model C302 Parts Replacement Schedule 9 Notes...
Page 48: ...10 4 LIMITED WARRANTY ON EQUIPMENT Model C302 Limited Warranty on Equipment 10 Notes...
Page 52: ...11 4 LIMITED WARRANTY ON PARTS Model C302 Limited Warranty on Parts 11 Notes...