OPERATING PROCEDURES
6-5
Models 702/741/772
Operating Procedures
6
7. Stand the mix feed tube in the corner of the mix
hopper, and assemble the hopper gasket.
Figure
6-16
Repeat steps 1 through 7
for the other side of the
freezer on Model 772.
Priming
Prime the machine as close to the time of first product
draw as possible.
1. Place a pail beneath the door spout and raise the
draw arm. Pour 2 gal. (7.6 L) of
fresh
mix into the
hopper and allow it to flow down into the freezing
cylinder. This will force out any remaining sanitizing
solution. When full-strength mix is flowing from the
door spout, lower the draw arm.
Figure
6-17
Important! Failure to remove all sanitizing solution may
result in damage to the freezing cylinder.
2. When the mix has stopped bubbling down into the
freezing cylinder, install the mix feed tube into the mix
inlet hole.
Figure
6-18
3. Place the control switch in the AUTO position. When
the unit cycles off, the product will be at serving
temperature.
Figure
6-19
4. Fill the hopper with mix. As the mix level comes in
contact with the mix level sensing probe on the rear
wall of the hopper, the MIX LOW light will extinguish.
12340
10181
12051
13998
Summary of Contents for 741
Page 10: ...1 6 TO THE INSTALLER Models 702 741 772 To the Installer 1...
Page 32: ...6 8 OPERATING PROCEDURES Models 702 741 772 Operating Procedures 6 Notes...
Page 38: ...9 2 PARTS REPLACEMENT SCHEDULE Models 702 741 772 Parts Replacement Schedule 9 Notes...
Page 44: ...11 4 LIMITED WARRANTY ON PARTS Models 702 741 772 Limited Warranty on Parts 11 Notes...