1
Floor stander
2
2
Placing frame
2
6
Hex socket head cap screw
M12*25
16
8
Plain washer
Φ24*Φ13*2.5 16
9
Spring washer
M12
16
11
2.3
Assembly
Before assembly, take a close look at the individual assembly steps shown and carry out the assembly
in the order given.
L
NOTICE
First loosely screw all parts together and check that they fit properly. Tighten the screws using
the tool only when you are instructed to do so.
Step 1:
Assembly of Floor Standers and Placing Frames
1. Assemble one placing frame
(2) to the lower floor standers
(1) by using eight screws (6),
eight spring washers (9) and
eight washers (8).
2. Assemble the other placing
frame (2) to the upper floor
standers (1) by using eight
screws (6), eight spring
washers (9) and eight
washers (8).
3. Now tighten all screws.
No.
Name
Specification
Qty.
Summary of Contents for TF-PTT0265
Page 2: ...2 Two Tier Rack...
Page 18: ...18 Two Tier Rack 7 3 Exploded Drawing...
Page 23: ...23 Notes...
Page 24: ...Taurus Studio Two Tier Rack...