13
2.3
Assembly
Before assembly, take a close look at the individual assembly steps shown and carry out the assembly
in the order given.
L
NOTICE
+
First loosely screw all parts together and check that they fit properly. Tighten the screws
using the tool only when you are instructed to do so.
+
If you have difficulty recognising the graphics, we recommend that you open and/or
download the PDF instructions stored in the webshop on your end device (e.g. smartphone,
tablet or PC). There you have the option of zooming in closer. Please note that the Adobe
Acrobat Reader programme must be installed on your end device in order to open the file.
Step 1:
Connecting Main Frame and Bottom Tube
Mount the two parts of the main frame (1) and the barbell cups (3) to the two bottom tubes (2)
on each side using four M12*90 hexagon bolts (50), eight Φ12 washers (54) and four M12 safety
nuts (53).
L
NOTICE
The assembly step is the same for both sides.
Summary of Contents for SEBR7132
Page 2: ...Elite Trainer 2...
Page 4: ...Elite Trainer 4...
Page 12: ...Elite Trainer 12...
Page 16: ...Elite Trainer 16...
Page 18: ...Elite Trainer 18...
Page 21: ...21...
Page 25: ...25...
Page 26: ...Elite Trainer 26...
Page 28: ...Elite Trainer 28...
Page 30: ...Elite Trainer 30...
Page 31: ...31 L NOTICE This bolt has been fixed in step 7 Use this bolt to fix the pulley...
Page 34: ...Elite Trainer 34...
Page 47: ...47 7 3 Exploded Drawing Smith Machine...
Page 49: ...3 12 2 13 6 5 4 11 16 1 8 14 15 10 7 9 49 7 5 Exploded Drawing Jammer Arms...
Page 54: ...Elite Trainer 54 Notes...
Page 55: ...55...
Page 56: ...Taurus Elite Trainer...