1
3
1
Foot frame
1
3
Parallel bars bracket
1
6
Rubber covered pedal
2
20
Hexagon socket button head screw
M10*30
4
24
Plain washer
Φ16*Φ8.4*1.6
8
25
Plain washer
Φ20*Φ10.5*2
4
27
Spring washer
M8
8
29
Nylon insert lock nut
M10
4
45
Hex socket head cap screw
M8*30
8
47
Arm pad
2
15
Step 4:
Assembly of Arm Pads and Pedals
1. Assemble the two rubber
covered pedals (6) to the
foot frame (1) by using
four screws (20), four
washers (25) and four
lock nuts (29).
2. Assemble the two arm
pads (47) to the parallel
bars bracket (3) by using
eight screws (45), eight
spring washers (27) and
eight washers (24).
3. Now tighten all screws.
Summary of Contents for PTT0215
Page 2: ...2 Knee Lifting Machine ...
Page 4: ...4 Knee Lifting Machine ...
Page 22: ...Exploded View 10 22 Knee Lifting Machine 6 3 Exploded Drawing ...
Page 27: ...27 ...
Page 28: ...Vertical Knee Raise PTT0215 ...