4
Barbell set
1
8
Protecting rack
2
18
Rod fi xing ring
4
22
Rubber bushing
4
26
Protective mats
4
27
Rubber bumper
2
46
Hex socket head cap screw
M6*20
8
51
Spring washer
M6
8
54
Plain washer
φ16*φ8.4*1.6
12
58
Nut
M8
6
61
Left barbell rack
1
62
Right barbell rack
1
63
Left Sliding Frame
1
64
Right Sliding Frame
1
65
Hex socket head cap screw
M8*30
6
66
Spring washer
M8
6
16
Smith Machine
Step 3:
Assembly of the Guide Rods and Barbell Set
NOTICE
The guide rods are pre-assembled.
1.
Slightly loosen the screws (44) and nuts (58) at the top of the left and right barbell racks (61 &
62).
2.
Loosen the screws (46) and spring washers (51) at the bottom of the left and right barbell racks
(61 & 62).
3.
Tilt up the left and right barbell racks (61 & 62).
4.
Mount the barbell set (4) to the left and right barbell racks (5 & 6) along with two rubber bushing
(22), two protection mats (26), two protecting racks (8) and two rubber bumpers (27).
5.
Remount the barbell racks (5 & 6) with the previously loosened screws (44 & 46), spring washers
(51) and nuts (58).
No.
Name
Specifi cation
Qty.
Summary of Contents for Elite Smith Machine
Page 2: ...2 Smith Machine...
Page 4: ...4 Smith Machine...
Page 13: ...13...
Page 15: ...15...
Page 17: ...17...
Page 26: ...26 Smith Machine 7 3 Exploded Drawing...
Page 31: ...31 Notes...
Page 32: ...32 Smith Machine Notes...
Page 33: ...33...
Page 34: ...Taurus Elite Smith Machine...