Thread Engagement

 

When threading bolts or threaded rod into bottom slot to hang equipment, ensure that the bolt or rod is 
long enough to fully engage the depth of the slot entirely or thread tear-out could be possible. Any less 
than 75% engagement could cause thread tear-out at less than rated loads for the system. 

Lock Washers

 

When threading bolts or threaded rod into bottom slot to hang equipment, ensure that the bolt or rod is 
secured in place with a nut and lock washer to prevent loosening due to vibration over time. 

Main Runner Splice Connectors

 

As shown below, the main runners have a steel splice connector inserted in one end at the factory. The 
splice connector should be inserted into the opposite end of the next main runner and then bolted 
together using an XL connector and (8) screws and lock washers. 

 

  

 