![TASKING iSYSTEM ST SPC58 Hardware User Manual Download Page 31](http://html1.mh-extra.com/html/tasking/isystem-st-spc58/isystem-st-spc58_hardware-user-manual_3656687031.webp)
NQ Pack Assembly
First check that the pin 1 positions on the pad pattern and all of the components are correctly
aligned.
1. Mount the NQPACK on the Target.
2. Install the YQPACK after checking for a match with the position of pin 1 for the NQPACK.
Then use the guides to affix the YQPACK to the NQPACK.
Do NOT use the screws included with the YQPACK for fixing the YQPACK. Do NOT use
the screwdriver included with the NQPACK for fixing the Guides. Note that you need to
provide your own screwdriver.
3. Connect the Emulation Adapter after checking for a match with the position of pin 1 for the
YQPACK, and connect the Debug Adapter / Active Probe from the BlueBox to the connector on
the Emulation Adapter. For more information on how to connect iSYSTEM hardware refer to
Emulation Adapter
YQPACK with guides
NQPACK
Electronic circuit PCB
Summary of Contents for iSYSTEM ST SPC58
Page 1: ...ST SPC58 H Line Emulation Adapter Hardware User Manual V1 8 November 2023 isystem com start...
Page 8: ...Adaptation setup Emulation Adapter offers the following adaption setups Fixed Adaptation...
Page 9: ...BGA Adaptation...
Page 17: ...Following picture shows DIPs location on the top side of the conversion board...
Page 23: ...Following picture shows DIPs location on the top side of the conversion board...
Page 30: ...Emulation Adapter with Debug Adapter Extender optional Solder part Electronic circuit PCB...
Page 33: ...User Notes This page is intentionally left blank...