![Task Force Tips CrewProtect LIC-300 Instructions For Installation, Operation And Maintenance Download Page 5](http://html1.mh-extra.com/html/task-force-tips/crewprotect-lic-300/crewprotect-lic-300_instructions-for-installation-operation-and-maintenance_3657596005.webp)
©Copyright Task Force Tips LLC 2021-2022
5
LIC-300 May 9, 2022 Rev02
3.3 WIRING
The CrewProtect is wired to the truck electrical system, allowing continuous decontamination of cabin air while the truck is actively
powered. Use the provided wiring diagram to ensure proper wiring.
Figure 3.3
4.0 OPERATION
Because the CrewProtect is wired directly to the truck electrical system, continuous air decontamination occurs the entire time the truck
is actively powered.
Regular cartridge replacement ensures optimal air decontamination. See section 6.0 on page 7 for cartridge lifecycle and replacement
instructions.
NOTICE
Always disconnect power before installing or servicing electrical components. Failure to do so
could cause damage to the circuit boards.
Internal
Pigtails
Requirements:
Minimum Wire Gauge - 18 AWG
Minimum Fuse
12V system - 6A slow blow fuse
24V system - 4A slow blow fuse
12V/24V
(fuse)