SLC Spring Loaded Cultivator

 

 

 
 

Assembly

 

 

Before Use & Adjustments

 

 

Before mounting of cultivator make sure that all nuts & bolts are properly secured. Also determine 
soil and trash conditions of the field and make the preliminary adjustments. e.g.

 

 

Tine leveling

 

To eliminate uneven working and side draft, leveling is done by means of top link.

 

 

Depth Control

 

The depth at which the implement is required to work is controlled hydraulically by raising or 
lowering the control lever on the tractor.

 

 

Attaching the Cultivator to the Tractor

 

 

1.

 

Place the cultivator duly leveled on the flat piece of land.

 

2.

 

Reverse the tractor to the cultivator (Do not drag the cultivator up to the tractor).

 

3.

 

Attach the left arm of the tractor to the cultivator first.

 

4.

 

Attach the central arm to the cultivator. To attach, turn the screws on both sides to an equal 
length. If the arm is too short or too long, turn the screw to adjust both at the same time until 
aligned with the hole on the central arm.

 

5.

 

Attach the lower right arm, turn the screw until the mounting pin is at the same level as the hole 
on the tractor arm. If the gap between the hole and mounting pin is too close or too distant, turn 
the control arm in or pull it away to an appropriate distance. You may have to adjust both height 
and distance at the same time. When the hole at tractor arm and mounting pin are even, insert 
the pin in the hole and lock it with the lynch pin.

 

6.

 

After attaching the cultivator, lift it and adjust the control arm parallel to the ground. When you 
look from both rear or sideways, all shovels should be touching the ground uniformly.

 

 

 

Operating Instructions 

Summary of Contents for SLC Series

Page 1: ...Printed October 2023 Spring Loaded Cultivator SLC Series Operator s Manual...

Page 2: ...2 SLC Spring Loaded Cultivator Page left blank intentionally...

Page 3: ...g dealer The equipment you have purchased has been carefully engineered and manufactured to provide dependable and satisfactory use Like all mechanical products it will require cleaning and upkeep Lub...

Page 4: ...afety 6 Safety Signal Words 6 General Safety Guidelines 7 Safety Decal Care 7 8 Before Operation 8 During Operation 9 Highway And Transport Operations 10 Operating Instructions 12 13 Maintenance 14 To...

Page 5: ...nditions Used for loosening and aerating soil up to 9 inches below the surface Prepares seedbeds quickly and economically When one tine strikes a hidden obstruction the others continue to work at the...

Page 6: ...instructions involving you personal safety and the safety of others Failure to follow these instructions can result in injury or death This symbol means Attention Become alert Your safety is involved...

Page 7: ...ally This equipment is dangerous to children and persons unfamiliar with its operation The operator should be a responsible adult familiar with farm machinery and trained in this equipment s operation...

Page 8: ...ecessary repairs Follow the maintenance safety instructions included with this manual Be sure that there are no tools lying on or in the equipment Do not use the machine until you are sure that the ar...

Page 9: ...r move the machine This is particularly important with higher noise levels and quiet cabs as you may not hear people shouting NO PASSENGERS ALLOWED Do not carry passengers anywhere on or in the tracto...

Page 10: ...m your dealer The use of flashing amber lights is acceptable in most localities However some localities prohibit their use Local laws should be checked for all highway and marking requirements When dr...

Page 11: ...ne length when making turns Operate the towing vehicle from the operator s seat only Never stand alongside of machine with engine running or attempt to start engine and or operate machine while standi...

Page 12: ...at the set depth The Spring Loaded Cultivator may be used for loosening and aerating soil to a depth of nine inches preparing seed beds quickly and economically The Spring Shank Cultivator is designed...

Page 13: ...ctor to the cultivator first 4 Attach the central arm to the cultivator To attach turn the screws on both sides to an equal length If the arm is too short or too long turn the screw to adjust both at...

Page 14: ...rse or replace the shovel point when worn out Delay may result in wearing out of the tines which will result into expensive repairing replacements Avoid use of extra wide shovels as they do not improv...

Page 15: ...alue or tightening procedure is listed for a specific application Fasteners must always be replaced with the same grade as specified in the manual Always use the proper tool for tightening hardware SA...

Page 16: ...16 SLC Spring Loaded Cultivator Page left blank intentionally...

Page 17: ...Printed October 2023 Spring Loaded Cultivator SLC Series Parts Manual...

Page 18: ...18 SLC Spring Loaded Cultivator Frame Assembly...

Page 19: ...Hex head bolt M12x35 28 52 6 SLC10280025 Nylock nut M12 28 52 7 SLC10260378 Hex head bolt M16x65 2 8 SLC10270005 Spring washer M16 2 9 SLC10280005 Nylock nut M16 2 10 SLC10260376 Hex head bolt M18x65...

Page 20: ...20 SLC Spring Loaded Cultivator Frame Assembly...

Page 21: ...7 16x2 5 BSW 2 6 SLC10280033 Plain nut 7 16 2 7 SLC10260418 Hex head bolt M16X95 1 8 SLC10280005 Nylock nut M16 1 9 SLC10270005 Spring washer M16 1 10 SLC10020039 Anchor pin 25X140 1 11 SLC10210004 S...

Page 22: ...22 SLC Spring Loaded Cultivator Frame Assembly...

Page 23: ...ound head bolt 7 16X2 5 LBSW 2 8 SLC10280033 Plain nut 7 16 BSW 2 9 SLC10260418 Hex head bolt M16X95 1 10 SLC10280005 Nylock nut M16 1 11 SLC10270005 Spring washer M16 1 12 SLC10020117 Anchor pin 22X1...

Page 24: ...ires tubes knives blades or other wear items Oil or grease is not covered by this warranty All obligations of Belco Resources Equipment under this limited warranty shall be terminated if Proper servic...

Page 25: ...25 SLC Spring Loaded Cultivator Page left blank intentionally...

Page 26: ...26 SLC Spring Loaded Cultivator 401 Jeffreys Road Rocky Mount NC 27804 www tarrivermfg com Tel 252 822 7140 Fax 252 787 5855 Sales tarrivermfg com...

Reviews: