background image

 

PTO 540 

rpm 

Spread Table in 

Type of seed 

Spread 

width 

ft. 

Work 

speed 
m.p.h. 

LEVER 

1R 

1S 

1T 

2R 

2S 

2T 

3R 

3S 

3T 

4R 

4S 

4T 

5R 

5S 

5T 

6R 

6S 

6T 

7R 

7S 

7T 

8R 

8S 

8T 

9R 

9S 

9T 

 
 

 

 

 
 

 

 

3.7 

 

 

23 

39 

55 

89 

125  159  218  275  334  393  451 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

17 

29 

41 

67 

94 

119  163  206  250  294  338 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6.2 

 

 

14 

23 

33 

54 

75 

95 

130  165  200  236  271 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7.5 

 

 

12 

20 

28 

45 

62 

79 

109  137  167  196  226 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

8.7 

 

 

10 

17 

23 

38 

54 

68 

94 

118  143  168  194 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 

 

 

 
 

 

 

3.7 

 

 

20 

32 

46 

75 

103  132  180  230  278  328  377 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

14 

25 

35 

56 

78 

99 

135  172  209  246  282 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6.2 

 

 

12 

21 

28 

45 

62 

79 

108  138  167  197  226 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7.5 

 

 

10 

17 

23 

37 

52 

66 

90 

115  139  164  188 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

8.7 

 

 

 

 

14 

20 

32 

45 

56 

78 

98 

120  141  161 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 

 

 

 
 

 

 

3.7 

 

 

23 

37 

52 

84 

114  146  207  266  327  400  469 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

17 

28 

38 

62 

86 

110  155  199  244  298  352 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6.2 

 

 

14 

22 

31 

50 

69 

87 

124  160  196  238  282 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7.5 

 

 

12 

19 

26 

42 

57 

73 

103  133  163  199  235 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

8.7 

 

 

10 

16 

22 

36 

49 

62 

88 

114  140  170  201 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 

 

 

 
 

 

 

3.7 

 

 

 

14 

41 

70 

96 

139  180  223  282  343  401  471  541  610  692  773 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

11 

30 

52 

72 

104  135  167  211  257  301  353  405  458  519  579 

 

 

 

 

 

 

 

 

 

6.2 

 

 

 

 

 

24 

42 

58 

84 

108  134  170  205  241  283  325  366  416  464 

 

 

 

 

 

 

 

 

 

7.5 

 

 

 

 

 

21 

35 

48 

70 

90 

112  141  171  201  236  270  305  346  386 

 

 

 

 

 

 

 

 

 

8.7 

 

 

 

 

 

18 

29 

41 

60 

77 

95 

120  146  172  202  232  261  296  331 

 

 

 

 

 

 

 

 

 

 
 

 

 

 
 

 

 

3.7 

 

 

 

11 

27 

43 

59 

84 

111  136  175  214  253  309  364  419  478  535 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

20 

32 

44 

62 

83 

102  131  161  190  231  273  314  359  401 

 

 

 

 

 

 

 

 

 

6.2 

 

 

 

 

 

16 

26 

36 

50 

66 

81 

105  128  152  185  219  252  286  321 

 

 

 

 

 

 

 

 

 

7.5 

 

 

 

 

 

13 

21 

29 

42 

55 

68 

87 

107  127  154  182  210  239  268 

 

 

 

 

 

 

 

 

 

8.7 

 

 

 

 

 

12 

18 

25 

36 

47 

58 

75 

91 

109  132  156  179  204  229 

 

 

 

 

 

 

 

 

 

 
 

 

 

 
 

 

 

3.7 

 

 

 

11 

21 

34 

45 

61 

79 

95 

127  159  191  227  261  296  350  401 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

16 

25 

33 

46 

59 

70 

95 

119  143  170  195  222  262  301 

 

 

 

 

 

 

 

 

 

6.2 

 

 

 

 

 

12 

21 

27 

37 

47 

57 

76 

95 

114  136  156  178  210  241 

 

 

 

 

 

 

 

 

 

7.5 

 

 

 

 

 

11 

17 

22 

30 

39 

47 

63 

79 

95 

113  130  148  175  201 

 

 

 

 

 

 

 

 

 

8.7 

 

 

 

 

 

 

 

14 

19 

26 

34 

40 

54 

68 

82 

96 

112  128  150  172 

 

 

 

 

 

 

 

 

 

 

Summary of Contents for RONDINI SQFT

Page 1: ...SQFT Pendular Spreader Operator s Manual Parts Breakdown Publication June 2021...

Page 2: ...AFETY GUIDELINES 3 SAFETY DECAL CARE 4 BEFORE OPERATION 4 DURING OPERATION 5 HIGHWAY AND TRANSPORT OPERATIONS 5 FOLLOWING OPERATION 6 PREFORMING MAINTENANCE 6 ASSEMBLY 7 OPERATION 8 SPREADING CHARTS 1...

Page 3: ...SAFETY Read and understand this manual and all safety signs before operating and maintaining Review the safety instructions and precautions annually TAKE NOTE THIS SAFETY ALERT SYMBOL FOUND THROUGHOU...

Page 4: ...oided by a few seconds of thought and a more careful approach to handling equipment You the operator can avoid accidents by observing the following precautions in this section To avoid personal injury...

Page 5: ...clothing and substantial shoes Assure that all tires are inflated evenly Give the unit a visual inspection for any loose bolts worn parts or cracked welds and make necessary repairs Follow the mainten...

Page 6: ...e and remove the ignition key Be especially observant of the operating area and terrain watch for holes rocks or other hidden hazards Always inspect the area prior to operation DO NOT operate near the...

Page 7: ...eration Correct all problems Follow the maintenance safety procedures Following operation or when unhitching stop the tractor or towing vehicle set the brakes disengage the FOLLOWING OPERATION PTO and...

Page 8: ...then secure both parts to the welded brackets on the spreader frame using the M8x55 bolts the M8 fender washers on one side and the 8 fender washers and M8 elastic stop nuts on the other side 10 On s...

Page 9: ...erator s Manual 5 To have read and understood all safety decals on the spreader 6 Checking the tractor tires for the proper pressure in accordance with the tractor Operator s Manual 7 Checking that al...

Page 10: ...used when spreading high moisture product such as damp fertilizer or peat The rubber insert provides a high viscosity surface that lets humid material flow through the spout better Optional Hydraulic...

Page 11: ...33 7 5 25 41 57 73 97 120 145 180 216 252 291 331 370 426 483 539 568 598 628 646 665 683 689 694 8 7 21 35 49 62 83 103 124 154 185 216 249 284 318 366 414 462 487 512 538 554 569 585 591 595 Calcium...

Page 12: ...1304 1406 1472 1540 1606 1636 1665 1695 1717 1731 46 83 119 156 211 265 319 399 477 557 646 733 824 900 978 1055 1104 1155 1204 1227 1248 1271 1288 1298 6 2 37 66 95 125 170 212 255 319 382 445 517 58...

Page 13: ...282 7 5 12 19 26 42 57 73 103 133 163 199 235 8 7 10 16 22 36 49 62 88 114 140 170 201 3 7 14 41 70 96 139 180 223 282 343 401 471 541 610 692 773 11 30 52 72 104 135 167 211 257 301 353 405 458 519 5...

Page 14: ...ould be no jerking movement The flywheel and the spout should move as one If there are stops and starts this may be an indication of wear on the bronze slide and it should be replaced immediately Fail...

Page 15: ...Parts Breakdown...

Page 16: ...15 Tar River Equipment SQFT 600 SQFT 800 SQFT 1000 Note Gearbox complete Part RP62 30 02...

Page 17: ...1 18 RP21 30 12 Nut 3 19 RP25 00 60 Cotter Pin 1 20 RP37 34 07 Tie Rod 600 1 20 A RP37 34 05 Tie Rod 404 21 RP37 02 15 Frame 600 1 21 A RP37 02 11 Frame 404 22 RP58 30 57 Plug 4 23 RP21 10 12 Nut 4 24...

Page 18: ...17 Tar River Equipment SQFT 600 SQFT 800 SQFT 1000 Note Gearbox complete Part RP62 30 02...

Page 19: ...RP58 22 25 Closed Deflector 1 54 RP25 81 03 Key 1 55 RP58 38 90 Washer 1 56 57 RP58 33 64 Plug 1 58 RP27 55 59 Ring 1 59 RP25 61 56 Ring 2 60 RP60 00 43 Bearing 3 61 RP35 10 07 Spacer 1 62 RP41 10 05...

Page 20: ...19 Tar River Equipment SQFT 600 SQFT 800 SQFT 1000 Note Gearbox complete Part RP62 30 02...

Page 21: ...Nut 1 96 RP63 80 28 Fork 1 96 A RP63 80 24 Fork 97 RP63 80 81 Ring Nut 1 98 RP63 80 65 Protection 1 98 A RP63 80 69 Protection 99 RP63 80 19 Ring Nut 1 100 RP63 80 52 Protection 1 100 A RP63 80 56 Pro...

Page 22: ...r Equipment dealer during regular working hours Tar River Equipment reserves the right to inspect any equipment or parts which are claimed to have been defective in material or workmanship This limite...

Reviews: