background image

Start by determining whether the control tubing will 

be routed through the base of the kick plate as in 

Figure 1

, or through the kick plate end cap as in 

Figure 2

.  It is recommended the kick plate be posi-

tioned as to be aligned with the center of the faucet/

sink.  

 

 

 

 

CONTROL TUBING ROUTED THROUGH KICK 

PLATE BASE 

(Figure 1)

 

 

 

STEP #1  

-

  Drill a 

1/2” 

to 

2” 

hole in the cabinet toe 

kick and similar size hole in the back of the inside of 

the cabinet floor.  Using a 

fish tape

, wire or other means, pull the control tubing through the 

holes.  Be sure not to kink the tubing

. Before drilling the holes, make sure there are no utilities in 

behind the cabinet panels which may be damaged.

 

 

STEP #2  

-

  Remove the end cap by removing the two screws on the end cap and slide off the 

cover 

(They may require tapping or prying to remove).

 

 

STEP #3  

-

  Momentarily reassemble the end cap back on the aluminum base. Temporarily re-

move the control tube bundle and the snap pushing from its hole in the base. Place the assembly 

against the toe kick. With the end caps resting on the floor and the center of the kick plate 

assembly aligned with the center of the sink/faucet, mount the kick plate with the two #8 x 

3/4” 

pan head Phillips screws provided.  

 

STEP #4  

-

 Remove the end cap. Slide the cover back on the kick plate base, by pressing down 

on each spring in succession while the cover is slid on. Remount the end cap. 

 

 

 

CONTROL TUBING ROUTED THROUGH PEDAL END CAP 

(Figure 2) 

 

 

It is recommended that the control tubing be routed 

on the inside of the hinge side of the cabinet door.  

 

 

STEP #1  

-

  Remove the end cap 

which the tubing is to be routed 

through by removing the two 

screws on the end cap and slide 

off the cover 

(They may require 

tapping or prying to remove).

 

 

STEP #2  

-

  Drill a 

5/16” 

hole 

through the end cap using the 

upper of the two cone shaped 

recesses on the inside of the end 

cap as a guide (see 

Figure 3

).

 

 

Repeat 

STEP #3 

and  

STEP #4 

as above.

 

Drill

 

5/16”

 

Hole

 

Figure 3

 

INSTALLING THE VALVE BLOCKS

 

INSTALLING THE KICK PLATE

 

The Tapmaster valve blocks are connected in

-

line between the 

hot and cold shut off valves and the faucet tubes as shown in 

Figure 4. The valve blocks are identical in function and may be 

used on either hot or cold water lines. Position them according 

to how the control tubing will be routed.  

 

 

STEP #1 

-

 Connect the control tubes from the kick plate to the 

valve block with the plastic sleeves provided as per the color

-

coded arrangement in 

Figure 4

. To ease installation, dip the 

ends of the tubing into hot soapy water and, using needle nose 

pliers, push the tubing on to the barb fittings. An adjustable 

wrench opened to the diameter of the tubing will assist in pushing on the sleeves. Take care not 

to damage the barb fittings or crush the tubes

. If a tube must be removed from a barb fitting, split 

the tube with a sharp knife 

(Do not pull as this may damage barbs).

 

Figure 4

 

-

2

Figure 1

 

End Cap

 

Control Tube Bundle

 

Bushing

 

Figure 2

 

Base

 

Actuator Valve

 

Springs

 

The kick plate assembly may require adjustment from time to 

time to compensate for wear in the latching mechanism or 

simply adjusted to suit personal preference. The latch may 

be set to operate heavy or sensitive depending upon the 

position of the pilot/actuator valve in the kick plate base.

 

 

STEP # 1 

-

 

Remove the kick plate assembly from cabinet 

toe kick and then remove the end cap

(To adjust the kick 

plate properly one should be able to see through the 

assembly as per 

Figure  6

).

 

 

STEP # 2

 

-

 Proceed to adjust the mounting height of the 

pilot/actuator valve by adjusting the valve body mounting 

nuts until there is approximately a 

0.02” 

air gap between the 

black button of the pilot/actuator valve and the inside of the 

cover.  Be sure to hold the hook of the cover against the 

catch of the base to take up any play 

(Note: Repositioning 

the nuts by as little as half a turn is often adequate)

 

 

STEP # 3

 

-

 Test the assembly for proper operation using 

your hands only. In momentary mode (

pressing the vertical 

face) the cover should move freely and the black button 

should bottom out before the hook of the cover bottoms 

against the base. In continuous mode (

pressing the angled 

face) the top of the cover should return to its unlatched 

position by a firm tap against the bottom vertical face of the 

cover. If  the cover unlatches with difficulty, the gap will 

need to be increased.  If the cover does not latch at all or is 

too sensitive, decrease the gap. Remount the kick plate to 

the cabinet toe kick as per instructions above.

 

ADJUSTING THE KICK PLATE

 

-

3

STEP #2 

-

 

Turn off  the water supplies and place a bucket 

underneath the shut off valves to catch water that may run out of 

the plumbing. 

(Closing the faucet handles will minimize leakage). 

Loosen the compression nuts on the connecting 

3/8” 

O.D. supply 

tubes, at the shut off valves. If the faucet utilizes copper tube risers, 

bend and reposition the tubes in such a manner as to create a 1

-

1/2" gap 

(DO NOT KINK). To simplify the installation, replace the 

copper risers with flex risers 

(available at hardware stores). If this 

cannot be readily accomplished the tubes will have to be shortened 

approximately 

1

-

1/2”. 

Cut the tubes with a tube cutter. If a tube 

cutter is unavailable a hacksaw may be used, however be sure to de

-

bur and square the ends. Extra compression nuts and sleeves are 

provided should the tubes need to be cut.

 

 

STEP #3 

-

 

Prior to installing the valve blocks, open the shut

-

off 

valves momentarily to flush out any debris in the water lines. Large 

pieces of water borne debris will be trapped by the filter/screen in 

the valve blocks and may reduce water flow or cause noisy 

operation. As shown in 

Figure 5 

connect the valve block(s) with the 

integrated nut (input) to the shutoff fitting and the faucet riser to 

the compression thread (output). Finger tighten only until both valve 

blocks are in position. Be sure the plastic control tubing and fittings 

are not damaged.

 

 

STEP #4

  

-

  Proceed to tighten the compression nuts using a 

5/8”

 

wrench on the nut and a 

7/8” 

wrench on the valve block body . Do 

not over tighten 

3/8” 

compression fittings with O

-

ring seals such as 

the valve block input fitting.  Hand tighten plus 1/2 turn with 

wrench.

 

 

STEP #5 

-

 Verify that all connections are tight. Turn on the water 

supply(s) and inspect 

all 

connections for leaks. Set the faucet, both 

hot and cold, completely open and push the kick place to activate 

the water flow. Operate the kick plate on and off rapidly to clear air 

from the valves. The valves may exhibit noise until the air is cleared. 

Figure 5

 

FAUCET 

RISER

 

OUTPUT

 

INPUT

 

SHUTOFF

 

LOCK

 

Figure 6

 

HOOK

 

CATCH

 

0.02”

 

MOMENTARY

 

& UNLOCK

 

Reviews: