
2
Parts Check List
Identify parts shown in images and screw
pack components listed below.
• 20 x 8g x 15mm pan head screws for
fixing top cover into cabinet
• 10 x M6 x 11mm Euro screws to fix
runners to cabinet
• 6 x 6g x 15mm countersunk screws
to fix drawer front connectors and
gallery rails
• 2x Front connectors
• 2x Gallery rail expansion dowels
• 2x Drawer side cover caps
Tanova TBT Series Installation
Space Required for Installation
Model
W
H
D
TBT30-210
267
365
510
TBT30-212
267
365
510