background image

4

4-1/4” [108mm] 

2-7/8” [73mm] 

4-1/4” [108mm] 

4-1/8” [105mm] 

Installation:

1. Shut off water supply and drain lines.

2. Mount no.

1

 assembly to deck with two no.

15

’s (See illustration.)

General Instructions

Note: To order replacement parts for the
bonnet assembly, order the B-50-P parts kit.

Note: Piping
supplied by others.

3

deck

3. Apply Teflon tape or pipe joint compound to threads of supply lines.   Install
two (2) inlets (hot and cold sides) and one (1) outlet. Connect supply lines
with ½” NPT piping.

4. Turn on water and check for leaks.

1

1

closed

closed

open

open

Summary of Contents for B-0509

Page 1: ...altered or modified after purchase or for defects caused by physi cal abuse to or misuse of the product or ship ment of the products Any express warranty not provided herein and any remedy for Breach of Contract which might arise is herebyexcluded and disclaimed Any implied warranties of merchantability or fit ness for a particular purpose are limited to one year in duration Under no circumstances...

Page 2: ...ExplodedView Some items are listed for instructional purposes and may not be sold as separate parts 3 3 16 4 5 1 2 5 4 6 15 12 11 13 14 11 10 9 8 7 Bonnet Assembly 2 ...

Page 3: ...6 Asm Bonnet 002856 40 7 Stem Valve 009306 20 8 Seat Washer 001084 45 9 Washer Bonnet Binding 001040 45 10 Bonnet 000608 25 11 Washer 000974 45 12 Packing Stem 000842 20 13 Spring 000895 45 14 Pushbutton 000753 25 15 Screw Mounting 000915 45 16 Socket Plug Note Items 7 9 and 11 13 are included in the B 50 P parts kit Quantity of 4 each 3 ...

Page 4: ...eneral Instructions Note To order replacement parts for the bonnet assembly order the B 50 P parts kit Note Piping supplied by others 3 deck 3 Apply Teflon tape or pipe joint compound to threads of supply lines Install two 2 inlets hot and cold sides and one 1 outlet Connect supply lines with NPT piping 4 Turn on water and check for leaks 1 1 closed closed open open ...

Page 5: ...a Para ordenar repuestos para el ensamble de la cubierta ordene el estuche de reparo B 50 P 3 Aplique cinta de Teflon o compuesto de coyuntura a las roscas de las líneas de surtido Instale dos 2 entradas lados caliente y frío y una 1 salida Conecte las líneas de surtido con tubería de rosca NPT 4 Abra el agua e inspeccione por filtraciones Nota La tubería es surtida por otros 3 Cubierta 1 1 Cerrad...

Page 6: ...ur l assemblage du capot commander la trousse à outils B 50 p Noter La tuyauterie fournir par les autres 3 Le plancher 3 Appliquer le ruban en Téflon ou le composé pour les tuyaux aux filets des tuyaux qui fournir l eau Installer deux 2 arrivées les côtés chauds et froids les côtés chauds et froids et une 1 sortie Brancher les tuyaux qui fournir l eau avec la tuyauterie de NPT 4 Recommencer l eau ...

Page 7: ...alls Ersatzteile zur Reparatur der Einheit benötigt werden bestellen Sie das B 50 P Ersatzteilkit Hinweis Rohre sind nicht in derLieferung enthalten Arbeitsplatte 3 Teflonband oder Rohrkitt zum Gewinde der Zufuhrleitungen auftragen Installieren Sie zwei 2 Zuläufe heiß und kalt und einen 1 Ablauf Verbinden Sie die Zufuhrleitungen mit 1 2 Zoll NPT Rohren 4 Wasser andrehen und auf Dichtheit prüfen 3 ...

Page 8: ...g products 2 Saddleback Cove P O Box 1088 T S Brass Europe Travelers Rest SC 29690 De Veenhoeve Phone 864 834 4102 Oude Nieuwveenseweg 84 Fax 864 834 3518 2441 CW Nieuwveen E mail tsbrass tsbrass com The Netherlands RELATED T S BRASS PRODUCT LINE B 0507 SINGLE PEDAL VALVE FLOOR MOUNTED ...

Reviews: