Tamarack Solar UNI-SPHD/4-90 Installation Manual Download Page 9

        

 
 

 

          

s

 
 

C.

 

        
        

D.

 

 

E.

 

F.

 

 
 

 
 
 
 
 
 
 
 
 
 

                    

upport@t

Loosely

 

att

 

Inner

 

34”

 

b

 

Flange

 

nut.

Attach

  

pivo

Hex

 

bolt,fla

See

 

chart

 

 

Insert

 

the

 

putting

 

the

Loosely

 

att

Pivot

 

Brack

the

   

5/16

1

 
 
 
 
 
 
 
 
 
 
 

 

Rotate

 

the

 

move

 

the

 

lo

Channels

 

lin

channel,

 

To

dimension.

 

                    

amaracks

ach

 

the

 

Swiv

brace

 

channe

 

ot

 

brackets

 

t

at

 

and

 

flange

B”

 

page

 

6

  

fo

bolts

 

in

 

from

e

 

flange

 

nut

ach

 

the

 

34”

 

ets,

 

through

18

 

x

 

3”

 

hex

 

b

Inner

 

and

 

O

ower

 

4”

 

pole

ne

 

up

 

and

 

co

orque

 

to

 

12

 

F

                    

solar.com

vel

 

Pivot

 

Bra

el

 

with

 

5/6

1

to

 

the

 

panel

 

e

 

nut,

 

torque

or

 

basic

 

posi

m

 

the

 

Pivot

t

 

inside

 

the

 

p

Inner

 

Brace

 

h

 

the

 

Swivel

 

bolt,

 

flat

 

and

uter

 

Brace

 

c

e

 

clamp

 

asse

onnect

 

with

 

Ft

 

Lbs.

 

See

 

b

                    

m            1

acket

 

to

 

the

 

18

 

3”

 

bolt,

 

fla

supports

 

wi

e

 

to

 

12

 

Ft

 

Lb

tioning

 

NOT

t

 

Bracket

 

sid

panel

 

suppo

Channel

 

to

 

Pivot

 

Bracke

d

 

flange

 

nut.

 

channels

 

to

 

p

embly

 

up

 

or

 

the

 

5/16

18

basic

 

positio

                    

1-800-819

end

 

of

 

the

 

at

 

and

  

ith

 

5/16

 

x

 

7/

s.

  

TE:

 

de

  

ort.

 

the

 

et,

 

with

 

parallel

 

each

down

 

so

 

tha

8

 

x

 

7/8

 

hex

 

b

ning

 

chart

 

o

                    

Ins

9-7236 Ex

/8

 

h

 

other

 

and

 

s

at

 

the

 

holes

 

bolts

 

in

 

the

 

la

on

 

page

 

6,

 

“E

 

stallation

 

Ma

xt 556

 

slip

 

the

 

Inne

in

 

the

 

Inner

ast

 

hole

 

on

 

t

E”

 

for

 

overla

anual

 

Hea

M

     P

er

 

inside

 

of

 

t

\Outer

 

Brac

the

 

end

 

of

 

e

p

 

reference

 

avy

 

Duty

 

SOP

Mount

 

Series

 

Page 8 

he

 

Outer,

 

e

 

ach

 

P

 

Summary of Contents for UNI-SPHD/4-90

Page 1: ...I M 2 F nst Man 2020 Editi Formodel talla nua on V 1 2 l UNI SPHD atio al D 4 90 on Ins stallation Ma anual Hea M avy Duty SOP Mount Series P ...

Page 2: ... Recomm cket Torque et Torque ket Torque olar com ts Views orts to Panel clamp to pol embled pane and set arra race Brace Compon nting Pole Mount olar photovo Pole Mount or a flat sur very effort to n your insta er support a r com wing size Hex mended e to 240 inch e to 132 inch e to 84 inch L 1 80 s e el array to Po ay angle nents for 60 and 7 oltaic PV ne can support face mounti o ensure yo llat...

Page 3: ...her Nut flan Bolt Hex Washer Washer Nut 1 4 eel compone e mount 40 80 pipe a e 7 longer t m 1 PTION EL SUPPOR CLAMP T CLAMP B BRACE BR CHANNEL CHANNEL BRACKET PIVOT BRA RACKET CLAMP BR 3 8 16 x 2 3 8 16 x 1 Flat 3 8 H lock 3 8 16 Hex HD x 5 16 18 x x 5 16 18 x flat 5 16 nge 5 16 S x 1 4 20 x flat 1 4 SS lock 1 4 20 fin hex nts will show nd the 2 sc han the cen 1 800 819 RT CHANN TOP BOTTOM RACKET ...

Page 4: ...el supports solar com ews Bracket 1e t 2ea Swiv s m 1 ea Lower 4 vel Bracket 1 800 819 Pole Clamp 2ea Pivo 2 pair 34 Ins 9 7236 Ex p Bracket 2 ot Bracket Inner and O stallation Ma xt 556 2ea Lower 2ea Sw Outer Brace anual Hea M P Brace Bracke wivel Pivot B Channels avy Duty SOP Mount Series Page 3 et Bracket P ...

Page 5: ...he panel suppo lock washer l mounting pipe though ween them N ger than th ounting hole mp Brackets l supports w flange nuts pport side T ts over the 2 tighten and e just to ke square and m 1 to Panels protected s ave approxim the panels th the open r orts with rs and hex holes h both pane NOTE the 2 e center to es on the pa s on the pipe with the 5 1 s Insert the Torque to 1 2 pipe thro d distort ...

Page 6: ...om er Pole clam Pole Clamp uts flats and ng south Ke ue to 20Ft Lb pre assem location and or a few stro he 4 Pole C n the 4 Pole with the 2 U to hold into m 1 mp to pole p Bracket w d lock wash eeping the U bs mbled pane d equipment a ong individua lamp Bracke e Clamp Bra bolts flats o the VEE bu 1 800 819 ith the hers as U bolts el array to P available this ls et center an cket locks and n ut all...

Page 7: ...imate po on the basi er Brace Brac 16 x 7 8 bo st each othe e Lower Po the pole wi d nuts So it final positio m 1 et array ang p to meet th place a temp nel support brace e ding on the pa osition for th ic position ch ckets togeth lt and flange er ole clamp an th the 3 8 1 can be mov n is made 1 800 819 gle e angle porary ts to hold anel hole cen e lower Pole hart er e nut nd lower 16 4 U ved up o...

Page 8: ...s t used to hold Outer Brace e open side o m 1 e Compone to the Lowe d lower brac Channels to of the chann 1 800 819 ents r Brace Brac ce brackets t the Swivel b nels facing ea Ins 9 7236 Ex ckets with th together brackets with ach other stallation Ma xt 556 he 5 16 18 x h the 5 16 1 anual Hea M P 7 8 hex bol 18 x 3 hex b avy Duty SOP Mount Series Page 7 t flat and olt flats P ...

Page 9: ...e Pivot t inside the p Inner Brace h the Swivel bolt flat and uter Brace c e clamp asse onnect with Ft Lbs See b m 1 acket to the 18 3 bolt fla supports wi e to 12 Ft Lb tioning NOT t Bracket sid panel suppo Channel to Pivot Bracke d flange nut channels to p embly up or the 5 16 18 basic positio 1 800 819 end of the at and ith 5 16 x 7 s TE de ort the et with parallel each down so tha 8 x 7 8 hex ...

Page 10: ... 1 pipe on the lo ssembled 5 m step 4 torq E do not ove ptional Flat s mount can bottom pipe e lower brac e 4 U bolts carded 1 800 819 ower 4 pole 16 hex bolt que the 2 U er torque th t surface m n be mounte e clamps Th ce bracket w s would hav Ins 9 7236 Ex e clamp asse ts to 12 Ft Lb U bolts on th his connectio mounting ed to flat su he lower pip with 3 8 16 ve been inst stallation Ma xt 556 emb...

Page 11: ...support tamaracks The solar com following a m 1 are a few ex 1 800 819 xamples of Ins 9 7236 Ex flat surface stallation Ma xt 556 e mounting anual Hea M P avy Duty SOP Mount Series Page 10 P ...

Page 12: ...support tamaracks solar com Flat surf m 1 face adap 1 800 819 tation to t Ins 9 7236 Ex tapered p stallation Ma xt 556 poles anual Hea M P avy Duty SOP Mount Series Page 11 P ...

Page 13: ...arts to repa ems are not re oper installatio defect that ha more it does n nufacturer or it anufacturer Ta any claim relate defects by repa sed to repair o y injuries or da ught against Ta r party even if s This limita 1 800 819 ilding codes in s are appropria pplied parts as s of the PV array ters are used in ading wind spe icensed profes ree from defec when installed sible peeling o r of 1 the d...

Page 14: ...on h posure One Vertic ations only It l geotechnica neer familiar d criteria win 1 800 819 Diameter ches ches hole guid Categor cal 4 inch S t is the installe l report may with local reg nd snow seis Ins 9 7236 Ex Min Hole D 45 inch 40 inch delines ry C chedule 40 er s responsib be required t gulations and smic All of stallation Ma xt 556 Depth hes hes 0 Pole bility to valida to assess gro d build...

Reviews: