![Tamarack Solar TTP Series Installation Manual Download Page 5](http://html1.mh-extra.com/html/tamarack-solar/ttp-series/ttp-series_installation-manual_815712005.webp)
TTP-46-MAN
Pole Mount - TTP Series
4
Array
Tilt
Angle
љ
Wind
Speed
(mph)
љ
Pipe
Above
Ground
(ft)
Hole
Depth
(ft)
Total
Pipe
Length
(ft)
Hole
Depth
(ft)
Total
Pipe
Length
(ft)
Hole
Depth
(ft)
Total
Pipe
Length
(ft)
Hole
Depth
(ft)
Total
Pipe
Length
(ft)
Hole
Depth
(ft)
Total
Pipe
Length
(ft)
Hole
Depth
(ft)
Total
Pipe
Length
(ft)
100
3.3
7.2
2.8
6.7
3.6
7.5
3.1
7.0
4.3
8.2
3.6
7.5
120
3.8
7.7
3.2
7.1
4.2
8.1
3.6
7.5
5.0
8.9
4.2
8.1
140
4.3
8.2
3.6
7.5
4.8
8.7
4.1
8.0
5.6
9.5
4.8
8.7
100
3.8
8.2
3.2
7.6
4.2
8.6
3.6
8.0
5.0
9.4
4.2
8.6
120
4.4
8.8
3.7
8.1
4.9
9.3
4.2
8.6
5.8
10.2
4.9
9.3
140
5.0
9.4
4.2
8.6
5.6
10.0
4.7
9.1
6.6
11.0
5.6
10.0
100
4.3
9.2
3.6
8.5
4.8
9.7
4.1
9.0
5.6
10.5
4.8
9.7
120
4.9
9.8
4.2
9.1
5.5
10.4
4.7
9.6
6.5
11.4
5.5
10.4
140
5.6
10.5
4.8
9.7
6.3
11.2
5.3
10.2
7.4
12.3
6.3
11.2
100
4.7
10.0
4.0
9.3
5.2
10.5
4.4
9.7
6.1
11.4
5.2
10.5
120
5.4
10.7
4.6
9.9
6.0
11.3
5.1
10.4
7.1
12.4
6.0
11.3
140
6.1
11.4
5.2
10.5
6.9
12.2
5.8
11.1
8.1
13.4
6.9
12.2
100
5.0
10.6
4.2
9.8
5.6
11.2
4.7
10.3
6.5
12.1
5.6
11.2
120
5.7
11.3
4.9
10.5
6.4
12.0
5.5
11.1
7.6
13.2
6.4
12.0
140
6.5
12.1
5.5
11.1
7.3
12.9
6.2
11.8
8.6
14.2
7.3
12.9
Array
Tilt
Angle
љ
Wind
Speed
(mph)
љ
Pipe
Above
Ground
(ft)
Hole
Depth
(ft)
Total
Pipe
Length
(ft)
Hole
Depth
(ft)
Total
Pipe
Length
(ft)
Hole
Depth
(ft)
Total
Pipe
Length
(ft)
Hole
Depth
(ft)
Total
Pipe
Length
(ft)
Hole
Depth
(ft)
Total
Pipe
Length
(ft)
Hole
Depth
(ft)
Total
Pipe
Length
(ft)
100
3.80
10.68
3.30
10.18
4.20
11.08
3.60
10.48
4.90
11.78
4.20
11.08
120
4.40
11.28
3.70
10.58
4.90
11.78
4.20
11.08
5.70
12.58
4.90
11.78
140
4.90
11.78
4.30
11.08
5.50
12.38
4.70
11.58
6.40
13.28
5.50
12.38
100
4.40
11.80
3.70
11.10
4.90
12.30
4.20
11.60
5.70
13.10
4.90
12.30
120
5.00
12.40
4.30
11.70
5.60
13.00
5.80
12.20
6.60
14.00
5.60
13.00
140
5.70
13.10
4.80
12.20
6.30
13.70
5.40
12.80
7.40
14.80
6.30
13.70
100
4.90
12.77
4.20
12.07
5.40
13.27
4.70
12.57
6.40
14.27
5.40
13.27
120
5.60
13.47
4.80
12.67
6.30
14.17
5.40
13.27
7.40
15.27
6.30
14.17
140
6.30
14.17
5.40
13.27
7.10
14.97
6.00
13.87
8.30
16.17
7.10
14.97
100
5.30
13.58
4.50
12.78
5.90
14.18
5.00
13.28
6.90
15.18
5.90
14.18
120
6.10
14.38
5.20
13.48
6.80
15.08
5.80
14.08
8.00
16.28
6.80
15.08
140
6.80
15.08
5.80
14.08
7.70
15.98
6.50
14.78
9.00
17.28
7.70
15.98
100
5.60
14.21
4.80
13.41
6.20
14.81
5.30
13.91
7.30
15.91
6.20
14.81
120
6.40
15.01
5.50
14.11
7.20
15.81
6.10
14.71
8.40
17.01
7.20
15.81
140
7.20
15.81
6.20
14.81
8.10
16.71
6.90
15.51
9.50
18.11
8.10
16.71
TTP
Ͳ
4
and
TTP
Ͳ
4HW
for
Array
Ground
Clearance
of
3
Feet
4.7
5.1
20°
Foundation Hole Depth, Height of Pole Above Ground and Total Pole Length for
Ground Clearance of 3 Feet
at Lowest Part of
the Array & Exposure Catgory B For Various Soil Class and Foundation Hole Diameter. Vertical Pipe is 6-inch Schedule 40
(Highlighted sections require 6-inch Schedule 80 Pipe)
Soil
Type
ї
Class
3
Class
4
Class
5
Foundation
Diameter
ї
36"
4.1
24"
36"
24"
36"
60°
30°
40°
50°
60°
20°
30°
40°
50°
Foundation Hole Depth, Height of Pole Above Ground and Total Pole Length for
Ground Clearance of 6 Feet
at Lowest Part of
the Array & Exposure Catgory B For Various Soil Class and Foundation Hole Diameter. Vertical Pipe is 6-inch Schedule 40
(Highlighted sections require 6-inch Schedule 80 Pipe)
Soil
Type
ї
Foundation
Diameter
ї
5.5
5.9
36"
24"
7.13
7.65
8.12
8.53
8.86
24"
36"
24"
36"
Class
3
Class
5
Class
4
24"
TTP
Ͳ
4
and
TTP
Ͳ
4HW
for
Array
Ground
Clearance
of
6
Feet