background image

TM

Soldering & Rework Station

QFP Soldering:

1. 

Apply the solder paste. Apply the proper quantity of solder paste and install the SMD on the PCB

2. 

Preheat SMD. Refer to the photo to preheat SMD

3. 

Soldering heat the lead frame evenly

4. 

Washing when soldering is completed, wash away the flux

Note :

 While here is a merit to solder by Hot air, it’s also possible to cause the defects such as solder balls, older bridges.  

We recommend you to examine the conditions of soldering sufficiently.

Precautions:

1. 

Before attach the nozzle, make sure that both the heating tube and the nozzle are cool down

2. 

 Caution high temperature operation do not use the unit near ignitable gases, paper, or other inflammable materials. 

Both the nozzle and the heated air are extremely hot and can cause painful burns. Never touch the heater pipe or allow 

the heated air to blow against your skin. Initially, the iron may emit white smoke, but this will soon disappear

3. 

 After use, be sure to cool the unit. After turning off the power switch, the unit will automatically blow cool air through 

the pipe for a short period of time. Do not disconnect the plug during this cooling process

4. 

 Never drop or sharply joint the unit. The pipe contains quartz glass, which can break if the unit is dropped or jolted 

sharply

5. 

 Disconnect the plug when you don’t use the unit for a long time. When the power cord is connected into the power 

supply, the unit has a little flow of electricity, even the power switch is in off position. So when you don’t use the unit for 

a long time, disconnect the plug

Replacing the Heating Element:

1. 

Remove the screws, slide the tube. Remove the 3 screws, which secure the Handle and slide the cord tube

2. 

 Open the handle. Disconnect the ground wire sleeve and remove the pipe. In the pipe. The quartz glass and heat 

insulation is installed. Do not drop or miss it

3. 

Remove the heating element. Disconnect the terminal and remove the heating element

4. 

 Insert a new heating element. Handle it with care. Never rub the heating element wire. Insert a new heating element 

and reconnect the terminal. Reconnect the ground wire after replacing the element. Assemble the Handle in the  

reverse order of disassembly. Insert the Handle’s projection into the hole in the pipe

:טירפ רואית

 

 תנחת

םח ריווא

 

תילטיגיד

 

560W

 

 :ןרצי

TENMA

 

 :םגד

21-10125

 

 :רימלט ט"קמ

2362602

 

המחלה תונחת / המחלה תונחתו םימחלמ / המחלה דויצו םימחלמ :רתאב םוקימ

 

מ"עב הקינורטקלא רימלט :ןאובי

 

Reviews: