background image

WEBS-PM 

 Pedestal Mount 

Emergency Phone Station with WEBS

®

 

Installation Instructions

 

 

Copyright 2014 Talk-A-Phone Co.

 

• 7530 North Natchez Avenue • Niles, Illinois 60714 • Phone 773.539.1100 • [email protected] • www.talkaphone.com.

 

All prices and specifications are subject to change without notice. Talk-A-Phone, Scream Alert, WEBS and WEBS Contact are registered trademarks of Talk-A-Phone Co. All rights reserved. 

 

Rev. 4/7/2014 

I.  Introduction 

WEBS-PM

 Pedestal Mount Emergency Phone Station with WEBS

®

 is designed to mount to concrete 

foundation using anchor bolts.   

II. 

Contents

 

Before beginning installation, make sure you have all the included components.  Each Pedestal consists 
of three packages.  Package #1 is the labeled 

WEBS-PM-KIT

.  Package #2 is labeled 

ETP-PM PARTS

.  

Package #3 contains the Pedestal itself. 

WEBS-PM-KIT

 

Qty. 

Part Number 

Description 

68642 

2-Channel Amplifier 

86396 

Power Supply (12VDC, 5A) 

83075 

Loudspeaker 

ETP-PM PARTS

 

Qty. 

Part Number 

Description 

42838 

J-Bolts 

42839 

3/4"-10 Hex Nut 

42840 

3/4" Washer 

42867 

10-24 x 1/2" Tamper Resistant Screws 

42843 

6-32 Hex Nut 

68590 

LED Panel Light (12-24VAC/DC, 120VAC) 

67478 

Polycarbonate Cover for LED Panel Light 

24717 

Pedestal Mount Aluminum Template 

III.  Installation 

1.  Electrical and telephone line conduits should be run through the foundation and into the center 4" 

diameter hole of the Pedestal. 

 

NOTE:

 To insure proper grounding of all electrical components, the tower mount should be effectively earth grounded 

from the grounding stud (located across from the lower access panel) with 6 AWG or better insulated, stranded copper 
wire to the metallic power service raceway (conduit) or an 8 foot or longer corrosion-resistant ground spike. It is the 
installer's obligation to ensure compliance with all national, regional, and local regulations

 

2.  Pour the foundation at least 2-feet in diameter and 3-feet deep according to your local code and frost 

line. 

 

3. 

Install the four (4) 3/4” 

10 x 24” long anchor bolts below grade 

with five inches

 

(5”)

 

projecting 

above grade

.  Use the template provided to properly position the bolts within the concrete 

foundation. 

 

 

 
 

 
 
 
 

Summary of Contents for WEBS-PM

Page 1: ...on 4 42838 J Bolts 8 42839 3 4 10 Hex Nut 8 42840 3 4 Washer 3 42867 10 24 x 1 2 Tamper Resistant Screws 2 42843 6 32 Hex Nut 1 68590 LED Panel Light 12 24VAC DC 120VAC 1 67478 Polycarbonate Cover for LED Panel Light 1 24717 Pedestal Mount Aluminum Template III Installation 1 Electrical and telephone line conduits should be run through the foundation and into the center 4 diameter hole of the Pede...

Page 2: ... air gap between the foundation and the Pedestal which will allow airflow and prevent moisture problems Verify that the nuts are level 0 pitch NOTE To insure proper grounding of all electrical components the tower mount should be effectively earth grounded from the grounding stud located across from the lower access panel with 6 AWG or better insulated stranded copper wire to the metallic power se...

Page 3: ...egarding device configuration and programming 5 For the WEBS PM 120VAC 240VAC power option connect the input power supply of the WEBS AMP 2 amplifier to 120VAC 240VAC 60Hz brown is positive blue is neutral 6 For the WEBS PM 12 24 VDC power option connect the WEBS AMP 2 amplifier to 12VDC 3A input white is positive black is negative 7 Mount the two 2 loudspeakers behind the appropriate speaker gril...

Page 4: ...ue Niles Illinois 60714 Phone 773 539 1100 info talkaphone com www talkaphone com All prices and specifications are subject to change without notice Talk A Phone Scream Alert WEBS and WEBS Contact are registered trademarks of Talk A Phone Co All rights reserved Page 4 of 4 All dimensions are in inches and are provided for reference only ...

Reviews: