![Tal-Tec LS4 User Manual Download Page 12](http://html2.mh-extra.com/html/tal-tec/ls4/ls4_user-manual_3347458012.webp)
place, with the mounting holes lining up with those
in the crate.
DROPPING
the crate or platform with the
loadbars fitted, or dropping the crate or platform
onto the loadbars, can overload and damage the
loadcells.
3. Attach the crate to the loadbars using the four (4)
bolts supplied (M10 x 75 bolt & nut).
4. If required, fit shims under the foot pads to
eliminate rocking.
5. To prevent the crate or platform sliding during
weighing, the loadbar foot pads can be bolted or
pegged to the foundation. This is not absolutely
necessary and weighing can be continued.
6. Mark the hole positions in the foot pads onto the
foundation and unbolt and remove the platform.
7. Drill the holes and fit at least one raw bolt into each
end of the load bar. Leave the bolts slightly loose.
8. Gently lower the platform onto the loadbars and
check that the platform mounting holes line up with
those in the loadbars. If not move the foot pads or
platform slightly using the free play in the mounting
holes, or drill out the mounting holes in the platform.
9. Bolt the platform to the loadbars and then tighten the
foot pad bolts.
Note: If the holes do not line up and the bolts are
forced, the scale will not Zero properly.
Tal-Tec
9