background image

TAKTL

®

 Field Guide | Drilling for Concealed Fasteners

Doc. P10-1  Rev. 1708

WWW.TAKTL-LLC.COM  |  412.486.1600  |  info

@

taktl-llc.com

        TAKTL

®

 Field Guide | Drilling for Concealed Fasteners | 2 of 8

B

02  Preparing the Drill

Lubricate the slide rails with Tri 

Flow lubricating oil and drill bit 

attachment areas with litihium 

grease as shown. Parts should be 

lubricated every two hours when 

using the drilling machine and at 

the start of each work day. 

(FIG. B)

A

01  Securing the Panel

Lay the panel face down on the 

clean foam sheeting provided in the 

shipping crate. Prep a clean secondary 

table for washing and drying panels 

after drilling. Set up staging rack for 

completed panels.

 

(FIG. A)

C

03  Calibration

To set the desired hole depth, locate 

the depth adjustment bolt. 

(FIG. C)

Wet drilling is required to reduce heat build up, sustain drill bit 

life, and produce clean holes with the least amount of chatter. 

 

Remember to maintain all TAKTL handling instructions while 

staging, moving, thoroughly drying, and storing panels.

IMPORTANT

Before Drilling

Summary of Contents for KEIL Anchor

Page 1: ...REQUIRED for drilling concealed anchor attachment holes Drilling machines can be purchased or rented through TAKTL Please contact your TAKTL Project Manager for more information and review the follow...

Page 2: ...tart of each work day FIG B A 01 Securing the Panel Lay the panel face down on the clean foam sheeting provided in the shipping crate Prep a clean secondary table for washing and drying panels after d...

Page 3: ...e holes on a scrap piece of material to tune the machine and make any adjustments by quarter turns to the stop washer Turning the stop washer clockwise will drill a more shallow hole counter clockwise...

Page 4: ...ess the side toggle lever FIG I to kick the drill bit for the undercut Release the side toggle lever before raising the bit out of the panel with the front lever J 08 Using the Depth Gauge After drill...

Page 5: ...posed to saw slurry water do not leave panels sitting in cut water for more time than is necessary Thoroughly rinse panels after cutting scrubbing with a plastic brush if necessary to completely remov...

Page 6: ...nd they can be removed by hand FIG C WARNING Do NOT operate the machine without both set pins in place and the black O ring holding them securely A 01 Clearing a Clog Turn the machine on its side Pres...

Page 7: ...06 Re attaching Black O ring Roll the black O ring over the shaft so that it seats into the notches on the heads of the set pins FIG F G 07 Test Turn the drill upright and gently push the side toggle...

Page 8: ...led Fasteners Doc P10 1 Rev 1708 WWW TAKTL LLC COM 412 486 1600 info taktl llc com TAKTL Field Guide Drilling for Concealed Fasteners 8 of 8 I 09 Inserting New Gasket Once replaced test for vacuum cap...

Reviews: