②
Drill a pilot hole and temporarily secure the base by fastening a BASE
MOUNT SCREW in the slot for holding the base in place like in the
figure above. Leave an estimated 4mm space.
③
Hang the BASE onto the screw fastened in for holding the base in place
then shift over, like shown in the figure below.
④
Other than the screw in step
②
, tighten all the other BASE MOUNT
SCREWS to secure the Base. Then tighten the screw fastened in step
②
.
⑤
Like shown in the figure to the left, check the directional positions of
the Base and the Body then attach the Body to the Base until a snap-
ping in place sound is heard.
⑥
Check to see if the Base is stable
⑦
Secure the Body using the 4 FIXING SCREWS for the BODY
⑧
Mount the wall hook for the operating rod.
Decide on where to mount the hook. Then temporally hold the hook
in place with double-sided tape. Push the hook in place so that the it
doesnʼ t spin around and then fasten in the HOOK MOUNTING SCREW
(4×16).
⑨
Double-check that the equipment functions properly.
After installing the equipment, check if the following functions oper-
ate properly.
・
If the Body is securely mounted.
・
If the pole elevates and lowers properly.
・
If the pole is leveled when being stored away
・
If the equipmentʼs locking mechanism functions properly.
・
If the pole is leveled in its stored position.
①
Decide on the
location to mount.
210
(
410
)
(
Edge of the BODY
)
210
(
410
)
(
Edge of the BODY
)
Where the Pitch of Ceiling Joist is 455 mm
Where the Pitch of Ceiling Joist is 303 mm
455
455
43
303
303
303
210
(
410
)
(
Edge of the BODY
)
210
(
410
)
(
Edge of the BODY
)
Where the Pitch of Ceiling Joist is 455 mm
Where the Pitch of Ceiling Joist is 303 mm
455
455
43
303
303
303
Slots for Holding Base in Place
OPERATING ROD
OPERATING ROD
BASE
BASE
Slots for Holding Base in Place
Please read before mounting
4mm
3
●
Discuss with the owner of the product before deciding on whether to place the lock part (location of the OPERATING ROD) on the right or left side.
Shown in the figure below, the LOCK part of the BODY should go on the right side of the 4 holes on the side of base can be seen. In addition, make
sure there is enough space for the screwdriver when mounting with a screw through the round whole on the side of the base.
●
The screw that is included cannot be used if the ceiling is made of concrete. In such cases, please discuss with the manufacturer or a specialist.
●
Please use a pan head screw if a screw other than the one that is included is going to be used.
※
Mount the base respective to the 303 or 455mm pitch of the ceiling joist.
Push into place
until a snap
is heard
③
Check to see if the
slot on the side of
the base and the
thread groove of
the body are on
the same side.
⑦
⑦
⑦
⑦
⑦
⑤-
2
⑤
Hang at first
Locking Part
⑤-
1
※
The dimensions in
( )
are of TG1609
BE AWARE that the body needs to be placed in the proper direction
when fastening the BODY MOUNT SCREWS
⑦
. With the locking
mechanism on the right-hand side, positioning yourself towards
the front of the body, fasten the FIXING SCREW for the body.
Sectional view