STEP 7
Remove cable (18) from selector shaft (38), remove 2 pan head Allen bolt M10x25 (71), 2 spring washer
(88) and 2 flat washers (91) from guide-rod (30). Incline the guide-rod (30), as shown in the drawing above and
then, remove the combination top weight stack (37) and selector shaft (38). Make sure the shock absorber rubber
are in the right position as shown the drawing. Then put 19 weight stacks (39) to the guide-rod (30), insert back the
combination of the top weight stack (37) and selector shaft (38). Assemble the guide-rod(30) to the tower frame(1)
using 2 spring washer(88), 2 flat washers(91) and 2pan head Allen bolts M10x25(71). Connect the cable (18) to the
selector shaft (39), using the right tools tighten properly bolts and nuts.
Nº
English description
Qty
1
TOWER FRAME
1
18
CABLE
1
30
GUIDE-ROD
2
37
TOP WEIGHT STACK
1
38
SELECTOR SHAFT
1
39
WEIGHT STACK
19
41
WEIGHT SELECTOR PIN
1
71
PAN HEAD, ALLEN BOLT M10x25
2
88
SPRING WASHER
2
91
FLAT WASHER
2
STEP 8
Insert the cable(18) through the pulleys support(44) on the lower main frame(3) and pulley support(44) on
the sliding tube(11), then fix the cable(18) in the terminal(32) to the front main frame(10) using 2 flat washer(91), 1
lock nut hex M10(94) and 1 pan head Allen bolt M10x35(72).Using the right tools tighten properly bolts and nuts.
Nº
English description
Qty
1
TOWER FRAME
1
10
FRONT MAIN FRAME
1
11
SLIDING TUBE
1
18
CABLE
1
19
CABLE STOPPER
2
32
TERMINAL
1
44
PULLEY
3
72
PAN HEAD, ALLEN BOLT M10x35
1
91
FLAT WASHER
2
94
LOCK NUT HEX M10
1
71
91
71
91
30
30
38
37
41
39
18
88
88
72
91
10
32
91
94
19
44
19
11
44
3
44
18