22
23
3.5 SECURING THE ROPE
Make sure you keep tension on the rope to
prevent the rope jumping off the winches.
Feed the rope trough the sheeve at the end
of the SSL and tie the rope to tie-off point on
both sides of the boomhead.
The crane is now build in
the SSL configuration.
READY TO
START LIFTING!