11
Decommissioning
11.1
Shutting down the fresh water station for a short period (<24 h)
Shutdown for a short period is suitable for per-
forming maintenance work on the fresh hot water
station.
Personnel:
n
Heating and sanitary technician
1.
Close all main shut off valves (Fig.
station.
ð
The flow and return lines are blocked.
2.
Switch off the fuse for the fresh hot water station or disconnect
the power plug and secure it against a restart.
3.
Wait until the fresh hot water station has cooled down.
ð
The fresh hot water station has been shut down for a short
period.
In order to remove an equipment option from the
piping or install an equipment option in the piping,
the corresponding circuit must be drained
(
Chapter 11.3 ‘Draining the fresh water station’
11.2
Shutting down the fresh water station for an extended period (>1 month)
Shutdown for an extended period is suitable when
the building section will not be occupied for an
extended period.
Fig.
36:
Closing the main shut off valve
TACOTHERM FRESH PETA 2 / PETA 2 X
Decommissioning
V02.2020 11/2020
Item no. 215747
EA no. 1329
Operating instructions
56