background image

 

 

 

 

SUPERSEDES: New                           Plant ID #9300-4104                                                     EFFECTIVE: February 17, 2021 

 

For information on Taco’s Zone Valve Controls (ZVC’s)  including catalog sheet, instruction sheets, Visio  stencils 

and  our  highly  praised  Zone  Controls Wiring Guide, scan the QR code to the left or go  to our website: 

www.TacoComfort.com. 

Overview: 

The ZVC406-5 is a six zone valve control that can have up to 6 thermostats 

connected and will operate up to 6 zone valves, plus 3 auxiliary outputs (AUX) to 

control circulators; like boiler and primary loops. 

The ZVC406-5 has a priority zone option, allowing zone 1 to operate and deactivate 

zones 2 through 6 during a priority call; this is ideal for when using an indirect water 

heater. 

The ZVC406-5 includes timing options for Post Purge, Pump Exercise and Priority 

Protection. The ZVC406-5 includes an energy saving program that can adjust the 

temperature of a modulating-condensing boiler or conventual On/Off boiler to 

increase the comfort level and use less fuel, without the need to install an outdoor 

sensor. 

 

Table of Contents 

1.

 

Warnings & Safety Information  

2.

 

Location & Installation  

3.

 

Operation & Dip Switch Settings 

4.

 

Wiring Procedure 

5.

 

Product & Applications Diagrams 

6.

 

Reset Control Setup & Wiring 

7.

 

The Taco eLink Mobile App  

8.

 

Troubleshooting & FAQ’s 

9.

 

Inner Cover Removal & Fuses 

10.

 

Specifications 

11.

 

Accessories & Replacement Parts 

12.

 

Warranty 

 

ZVC406-5 Zone Valve Control

 

102-575

 

 

 

  

Summary of Contents for ZVC406-5

Page 1: ...e zones 2 through 6 during a priority call this is ideal for when using an indirect water heater The ZVC406 5 includes timing options for Post Purge Pump Exercise and Priority Protection The ZVC406 5...

Page 2: ...ceeding the FCC radio frequency exposure limits human proximity to the antenna shall not be less than 20 cm during normal operation and must not be co located or operating in conjunction with any othe...

Page 3: ...al connectors for field wiring Low and live voltage wiring per code Location Do not mount to a surface that exceeds 104 F 40 C The unit must be only located in dry interior locations Use only copper c...

Page 4: ...output will energize when any zone calls for heat except the priority zone When the dip switch is set to ON the AUX 2 circulating pump output will energize when any zone calls for heat Post Purge Oper...

Page 5: ...one control s 3 Connect 3 on Master zone control to 3 on all Expansion zone control s Power Input 120 vac H Connect to 120 vac Hot side of power supply to zone control N Connect to 120 vac Neutral sid...

Page 6: ...ical Diagram Electrical Diagram Dip Switch Settings 1 OFF Master 2 ON Priority 3 OFF Primary Pump 4 OFF or ON Post Purge 5 OFF or ON Pump Exercise 6 OFF Time Delay 2 Wire ZV Conceptual Sketches Only r...

Page 7: ...FF or ON Pump Exercise 6 OFF Time Delay 2 Wire ZV PA02 V SR506 5 with 5 Zone Circulators Indirect DHW Primary Secondary Mechanical Diagram Electrical Diagram Conceptual Sketches Only refer to individu...

Page 8: ...perature Zones Indirect DHW Primary Secondary Mechanical Diagram Electrical Diagram DipSwitchSettings Expansion 1 ON Expansion 2 OFF Priority 3 OFF PrimaryPump 4 OFForON PostPurge 5 OFForON PumpExerci...

Page 9: ...Electrical Diagram DipSwitchSettings 1 OFF Master 2 OFF Priority 3 OFF PrimaryPump 4 OFForON PostPurge 5 OFForON PumpExercise 6 OFF TimeDelay2 Wire Conceptual Sketches Only refer to individual manufa...

Page 10: ...meters to operate See section 7 for more information on the Taco eLink mobile app Wiring of Reset Control Remove the inner cover as shown in section 9 of this manual on page X to have access to wire S...

Page 11: ...or Android mobile devices Follow the app menu to configure advanced features that the Taco new zone controls have to offer including Different levels of access Zone naming Programmable output naming...

Page 12: ...The eLink APP...

Page 13: ...The eLink APP...

Page 14: ...or a 1000 ohm watt resistor has proven to work with most Problem No heat in a zone or room of building Solution LED diagnostic lights will help find a component that is not working properly The green...

Page 15: ...perature Rating 58 F to 230 F 50 C to110 C DIP Switch Timing Settings Post Purge 30 seconds adjustable with mobile app Pump Exercise 30 seconds per 2 weeks of space heating inactivity adjustable with...

Page 16: ...se with a Taco product or part or for any application restrictions consult the applicable Taco instruction sheets or contact Taco at 401 942 8000 Taco reserves the right to provide replacement product...

Reviews: